This chart provides detail of the Current Cost for Treatment ofthe entire improved system <br />Cost for Treatment wftotal <br />$60,000,000 <br />$50.000.000 -- - - <br />$40,000,000 - <br />$30.000,000 -~ - <br />$20.000,000 -- - - - <br />$10.000.000 ~- __ <br />I <br />$o <br /> MajorAaterial <br />®SlurrySeal $0 <br />®Oveday $892,000 <br />O Re-Const $489,000 <br />^TOTAL $1,381,000 <br />The following Graph provides detail ofthe Treatment needs for the Improved Svstem by percentage <br /> <br />100%-_-- Im proved S~r stem C urrent Nee ds by F C <br /> -- <br />~ 90% - - <br /> ~~ ~ " <br />~ ~~ <br /> <br />~ • +~ <br />70% -~ _ <br />60% -~-- - <br />f <br />~ I <br />~~ <br /> ~~ ~? <br />50% -' <br />- - -- <br />i <br />~ - <br />40% - <br />- -- <br />i <br />30% -~ <br />- - - <br /> <br /> <br />~ ~ <br />~ <br />i <br />, <br />- <br />20% - - <br />--- <br />--- <br /> - <br />0% - <br />Major Arterial Minor Arterial Cdledor Neighborhood Collector Residential TOTAL SYSTEM <br />O Re-0onst 2% 21% 11% 12% 1% 6% <br />^Oveday 13% 36% 33% 33% 11% ~ 18% <br />^SSeal D% 0% 0% D% 14% 9% <br />®No Treatment 85% 43% 56% 56% 75% 61% <br />Page 6 <br />NBnorArtedal Cdledor NeighborhoodColledor Residental TOTAL SYSTEM <br />$0 $0 $0 $1,375,000 $1,375,000 <br />$10,212,000 $3,664,000 $2,530,000 $3,098,000 $20,396,000 <br />$23,289,000 $3,049,000 $2,351,000 $1,593,000 $30,771,000 <br />$33,501,000 $6,713,000 $4,861,000 $6,066,000 $52,542,000 <br />