Emerging Deficiencies Requiring Correction Within 5 Yrs <br />A3 Primary Building Systems <br />composition Reroof monitors $7,438 2 <br />roofing <br />general ext painting Repaint older stucco $5,000 3 <br />striping Restripe front parking lot $4,102 2 <br />striping Restripe inside gates (including speed limit graphics) $2,500 2 <br />general ext painting Repaint signage north wall $1,250 3 <br /> Primary Building Systems $20,289 <br />A4 Seconda ry Building System <br />interior gyp bd Paint walls in rooms 013, 016,017,042 $1,875 2 <br />walls <br /> ei <br />interior flatwork Paint concrete floors in office hallways 047, 046 $1,200 2 <br />interior gyp bd Add chair rail to rooms 016, 017 $313 2 <br />walls <br />resilient flooring Replace resilient base by west entry into 030 $125 2 <br /> Secondary Building System $3,513 <br />A5 Service Systems <br />electric generation Room 030 - Replace the 600 amp automatic transfer switch located $12,500 4 <br />system adjacent to the main distribution equipment <br />elect service and Room 42 -relocate the existing panel switch such that the highest circuit $2,500 5 <br />distrib breaker handle is less than 6 feet 7 inches . Reconnect and test all circuits. <br />mech system Room 059 thermostat is located in direct sunlight. Relocate thermostat. $250 2 <br />controls <br />Service Systems $15,250 <br />Totals For -Emerging Deficiencies Requiring Correction Within 5 Yrs $39,052 <br />PW Maintenance -Roosevelt Date Printed 78 Feb-02 VI-7 <br />