New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2008-13 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2008-13 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:18:55 AM
Creation date
6/1/2009 12:25:42 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
3/12/2007
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation Funding Secured <br />Upgrades to City Standards <br />Game Farm Road from City Limits to I-5 <br />Project Description: Upgrade to atwo-lane urban facility. Typical section would match proposed County <br />improvements to the west. Two lanes with a center access lane and bike lanes. A setback sidewalk would <br />be constructed on the west side with road drainage captured in a roadside ditch on the east side of the <br />street. <br />Secured federal funding of $319,000 will be administered by ODOT and will not be received by the City of <br />Eugene. <br />This project improves an unimproved collector street to City standards and meets priority 2 of <br />TRANSPLAN Financial Policy #6 by improving the safety, efficiency and capacity of existing transportation <br />facilities, and by providing better access for alternative modes. This project is included in the Six-Year CIP <br />because the projects include funding sources -federal surface transportation funds, assessments to <br />benefiting properties and transportation SDC's- that are not available for projects that meet the first priority <br />measure of "Protect the existing system". <br />Project Status: In Progress In 2006-11 CIP for $638,000. <br />Specific Plans/Polices Related to this Project <br />TransPlan <br />Capital Costs ($ .n tnousands> <br /> 2008 2009 2010 2011 2012 2013 Total <br />Fund <br />Assessments 55 0 0 0 0 0 $55 <br />SDC Storm 80 0 0 0 0 0 $80 <br />SDC Trans 750 0 0 0 0 0 $750 <br />Total $885 $0 $0 $0 $0 $0 $885 <br />Neighborhood: Harlow <br />Ward: Ward 4 <br />City of Eugene 2008-2013 Capital Improvement Program <br />208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.