Stormwater Funding Secured <br />Upgrades. and Capacity Enhancement <br />Royal Node Stormwater Infrastructure <br />Project Description: Enhance existing open waterways to achieve multiple benefits including <br />conveyance, water quality, and natural enhancements. <br />Project Status: Not Started In 2006-11 CIP funded and unfunded.Project cost decreased by $815,000 <br />over prior CIP. <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Royal Avenue Specific Plan <br />Stormwater Basin Master Plan <br />Capital Costs ($ in thousands) <br /> <br />Fund <br />2008 <br />2009 <br />2010 <br />2011 <br />2012 <br />2013 - __ <br />Total <br />SDC Storm 150 40 0 0 0 0 $190 <br />Stormwater 150 0 50 0 0 0 $200 <br />Total $300 $40 $50 $0 $0 $0 $390 <br />Neighborhood: Bethel <br />Ward: Outside City Limits <br />City of Eugene .2008-2013 Capital Improvement Program <br />184 <br />Localized flooding in the Royal Node area <br />