Stormwater Funding Secured <br />.Upgrades and Capacity Enhancement <br />River Avenue to Beltline Storm Drain <br />Project Description: Remove and replace existing deteriorated 30 inch diameter corrugated metal storm <br />pipe between River Avenue and Beltline .Highway which has filled with sediment, has separated joint <br />sections and has reverse grade in its vertical alignment. Provide access to this system. near Beltline where <br />it connects to a 42" concrete pipe. <br />Project Status: Not Started -New in FY08-13 CIP <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Stormwater Basin Master Plan <br />Capital Costs ($.n thousands) <br />Fund <br />SDC Storm <br />Stormwater <br />Total <br />2008 2009 2010 2011 2012 2013 Total <br />0 100 0 0 0 0 $100 <br />50 100 0 0 0 0 $150 <br />$50 $200 $0 $0 $0 $0 $250 <br />Neighborhood: River Road <br />Ward: Ward 7 <br />City of Eugene 2008-2013 Capital Improvement Program <br />183 <br />