New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2008-13 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2008-13 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:18:55 AM
Creation date
6/1/2009 12:25:42 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
3/12/2007
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater Funding Secured <br />.Upgrades and Capacity Enhancement <br />River Avenue to Beltline Storm Drain <br />Project Description: Remove and replace existing deteriorated 30 inch diameter corrugated metal storm <br />pipe between River Avenue and Beltline .Highway which has filled with sediment, has separated joint <br />sections and has reverse grade in its vertical alignment. Provide access to this system. near Beltline where <br />it connects to a 42" concrete pipe. <br />Project Status: Not Started -New in FY08-13 CIP <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Stormwater Basin Master Plan <br />Capital Costs ($.n thousands) <br />Fund <br />SDC Storm <br />Stormwater <br />Total <br />2008 2009 2010 2011 2012 2013 Total <br />0 100 0 0 0 0 $100 <br />50 100 0 0 0 0 $150 <br />$50 $200 $0 $0 $0 $0 $250 <br />Neighborhood: River Road <br />Ward: Ward 7 <br />City of Eugene 2008-2013 Capital Improvement Program <br />183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.