Stormwater Funding Secured <br />Stormwater Rehabilitation and Improvements <br />Harlow Neighborhood Basin Drywell Decommissioning <br />Project Description: Pilot project to decomission problematic dry wells and alleviate localized flooding <br />issues within neighborhood. Drywells in this neighborhood perform so poorly the streets and sidewalks are <br />regularly inundated. This project is consistent with the City's Water Pollution Control Permit Application to <br />Oregon Department of Environmental Quality that includes decommissioning underground injection control <br />facilities. <br />Project Status: Not Started New in FY08-13 CIP. Preliminary scoping completed in 2006. <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Stormwater Basin Master Plan <br />Capital Costs ($ .n thousands) <br />Fund 2008 2009 2010 2011 2012 2013 Total <br />Stormwater 270 300 230 0 0 0 $800 <br />total $270 $300 $230 $0 $0 $0 $800 <br />Neighborhood: Harlow <br />Ward: Ward 4 <br /> __ <br />~ i <br />~' 2- <br />y <br />y <br />~ ~ HAP.LQW Rd <br />Q <br />a <br /> QkF~,~ ~ <br /> ~ <br />~, a <br /> L <br /> <br /> <br />~~ <br />a <br />~1~~~ <br />I ~~ I• if 5 <br /> ~~,;,t.1t~,tiS ~}~ <br /> P~4~RTI4~! LUTHEff tGf~lGJR BLVD 'J <br /> <br /> <br />~`D <br /> <br />~r~ <br />~ <br /> <br />KINSRQW a <br />w <br />1 <br /> r,. , <br />'kRf~ + <br /> ~, <br />~R, <br />In the south Harlow neighborhood between <br />Harlow RD. and I-105,East of Coburg RD. <br />Includes drywells on Sorrel, Dartmoor, <br />Hambletonian, Rustic, Walnut and Cherry <br />Streets. <br />City of Eugene 2008-2013 Capital Improvement Program <br />176 <br />