Stormwater Funding Secured <br />Stormwater Rehabilitation and. improvements <br />General Stormwater Rehabilitation <br />Project Description: Rehabilitate, reconstruct and install stormwater system where needed due to various <br />problems; such as deterioration due to age, poor materials, localized flooding, and/or systems limitations. <br />Where feasible, natural systems are used to address existing problems in conformance with <br />Comprehensive Stormwater Management Program. <br />Project Status: Not Started In 2006-11 CIP, project funding has increased by $255,000 over prior CIP. <br />Designated as "generic" capital project. Funds are budgeted under this project and later transferred to <br />specific projects as they are identified and developed. <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Stormwater Basin Master Plan <br />Capital Costs ($ in thousands) <br />Fund 2008 2009 2010 2011 2012 2013 Total <br />Stormwater 75 75 75 75 75 75 $450 <br />Total $75 $75 $75 $75 $75 $75 $450 <br />Neighborhood: Citywide <br />Ward: Citywide <br />City of Eugene 2008-2013 Capital Improvement Program <br />175 <br />Stormwater Pipe <br />