New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2008-13 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2008-13 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:18:55 AM
Creation date
6/1/2009 12:25:42 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
3/12/2007
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Buildings and Facilities Placehoider <br />New Capital Facilities <br />Eugene Depot Phase 3 <br />Project Description: The Depot Phase 3 placeholder project includes a number of elements that <br />represent future directions for development of the site, rather than specific project proposals that would <br />provide relatively accurate project cost estimates. These elements, which could be staged at different <br />times during the CIP period, include the acquisition and extension of Oak Street, acquisition and <br />_ renovation of the historic "Express Building" to support expansion of the Depot passenger terminal, <br />j construction of a layover facility for Amtrak trains, and construction of a pedestrian overpass and <br />associated land acquisition costs. In terms of providing an indication of future funding needs, the <br />combined cost could be in the range of $25 to $35 million in 2008 dollars, depending on the timing and <br />actual scope of each project element. <br />Project Status: Not Started Phase 3 of a multi-phase master plan for improvements at the Eugene <br />Depot. Phase 1 acquistion and restoration completed. Phase 2 passenger improvements is in preliminary <br />design. <br />Capital Costs ~$ in thousands) <br />Capital cost by year not yet determined for this placeholder project. <br />Neighborhood: Downtown <br />Ward: Ward 7 <br />Master Plan Diagram <br />
The URL can be used to link to this page
Your browser does not support the video tag.