Public Buildings and Facilities Placehoider <br />New Capital Facilities <br />Eugene Depot Phase 3 <br />Project Description: The Depot Phase 3 placeholder project includes a number of elements that <br />represent future directions for development of the site, rather than specific project proposals that would <br />provide relatively accurate project cost estimates. These elements, which could be staged at different <br />times during the CIP period, include the acquisition and extension of Oak Street, acquisition and <br />_ renovation of the historic "Express Building" to support expansion of the Depot passenger terminal, <br />j construction of a layover facility for Amtrak trains, and construction of a pedestrian overpass and <br />associated land acquisition costs. In terms of providing an indication of future funding needs, the <br />combined cost could be in the range of $25 to $35 million in 2008 dollars, depending on the timing and <br />actual scope of each project element. <br />Project Status: Not Started Phase 3 of a multi-phase master plan for improvements at the Eugene <br />Depot. Phase 1 acquistion and restoration completed. Phase 2 passenger improvements is in preliminary <br />design. <br />Capital Costs ~$ in thousands) <br />Capital cost by year not yet determined for this placeholder project. <br />Neighborhood: Downtown <br />Ward: Ward 7 <br />Master Plan Diagram <br />