New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Park Concept Design
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Amazon Park Concept Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:55:29 AM
Creation date
6/1/2009 12:25:09 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Miscellaneous
PW_Subject
Amazon Park
Document_Date
2/15/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Concept Design <br />As a result of months of research, observation, design work, and public input, a Concept <br />..Design was formulated. See the Amazon Park Concept Design drawing in the appendix. The <br />projects are listed in the accompanying spreadsheet within categories of improvement <br />type: <br />GENERAL PARK IMPROVEMENTS <br />General park improvement projects include basic park amenities such as a new restroom <br />--- ~ r- <br />by the play area, picnic area upgrades, - ' <br />and additional benches and landscaping. a ,- ~~ ~ ~ ~ ..fir <br />'1 ~! - "` ~ <br />Also included is the removal of the ~ ~ ; ~~ t ~ . ~ ~ ~, <br />decommissioned wading pool, and ~ l `~ ~~~f <br />eventual replacement of the Adidas trail ' ~ -,., ~-~ ;~ ~~ ~' <br />lighting. Additional property is also J ~ ' `: ~' `_; ~` ~. <br />identified for possible acquisition in the _ _ ;`; ~'° ~ ~ ~ !L~~~ <br />northeastern corner of the ark. ~ ~~ ~~' ~ - -~"" ~ ~~ <br />p <br />New rest room, picnic and play area enhancements <br />ACCESS/CIRCUI,ATION/I'ARKING <br />Pedestrian, bicycle, and automobile access to the park is addressed through a series of <br />projects. Anew pedestrian bridge over the creek and a new lighted crossing at 26th and <br />Hilyard are the cornerstones of these improvements. The proposed bridge design is a <br />1% for Art piece by local artist, Lee Imonen. The Zig Zag Bridge serves a functional <br />purpose of stream crossing while celebrating the beauty of the place with a meandering <br />form. Additionally, new pathways will facilitate east/west movement through the park <br />as well as establishing anorth/south link <br />~' ~ ~' ~ to the adjacent Roosevelt Middle School. <br />`~ u- ~ `~ Better pedestrian access across Amazon <br />_~ <br />7 ~, `~ ~ i <br />T ~ ~~`1 ~} ~ Parkway is also desired, and will continue. <br />_ ~ to be explored with City Transportation <br />>°' ~' . <br />'v' `" ~ Planning staff. Overflow parking for high <br />capacity pool crowds is accommodated in <br />~,-.~ : h <br />'_~ `V ~----.~ ~. an area of unirrigated grass behind <br />~~ ~ ~ r a, ~ - - c~ <br />Hilyard Community Center. <br />New eastlwest path connection and bridge <br />ACTIVE RECREATION <br />A variety of improvements to existing recreation amenities will facilitate better use and <br />enjoyment of the facilities. Renovation of the dog park, Adidas Running Trail, fitness <br />course and children's play area are included. Renovation and expansion of the existing <br />Century ballfield into two multi-use playing fields will enable usage of the space for <br />many types of sports. <br />:Amazon Park Concept Design .Page 11 February 15, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.