WASHINGTON COUNTY <br />Name: 10TH AVE: N ADAIR - N BASELINE Key: 14392 <br />Hwy/St: TUALATIN VALLEY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-8 <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$205,000 2008 OTHER $205,000 <br />$64,000 2009 OTHER $64,000 <br />$0 <br />$668,000 2009 OTHER $668,000 <br />$0 <br />Description: Total: 937 000 Applicant: CITY OF CORNELIUS <br />RECONSTRUCTION & INTERSECTION IMPROVEMENTS <br />Status: t;onst. scheduled to oegm m ZUUy <br />Work type: Modernization <br />Name: OR8: MINTER BR RD - MT VIEW LANE Key: 15044 <br />Hwy/St: TUALATIN VALLEY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-8 <br />Planning: <br />Milepoints: <br />11.28 to 17,gg Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$855,000 2009 NHS $736,504 HSIP $31,539 <br />$24,000 2010 NHS $21,535 <br />$0 <br />$8,396,000 2011 NHS $7,081,707 HSIP $232,284 BIKPED $251,880 <br />$0 <br />Description: Total: $9,275,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />PAVING Work type: Pavement Preservation <br />Footnote: Project has Safety & Bikped element <br />Name: OR47 & E MAIN ST:SIDEWALK & LANDSCAPING (GASTON) Key: 15479 <br />Hwy/St: SUNSET <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-47 <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1.248.000 Applicant: CITY OF GASTON Status: Const. scheduled to begin in 2010 <br />SIDEWALK/LANDSCAPING ENHANCEMENT Work type: Enhancement <br />Name: OR 47: SOUTH FORK DAIRY CR - KEMPER RD Key: 15067 <br />Hwy/St: NEHALEM <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-47 <br />Planning: <br />Milepoints: <br />86.20 to 86.80 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 _.... <br />$86,000 2008 HSIP $79,309 <br />$68,000 2009 HSIP $62,710 <br />$68,000 2009 HSIP $62,710 <br />$1,032,000 2010 HSIP $951,710 <br />$0 <br />Description: Total: $1.254,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />GRADING; PAVING; INSTALL LEFT TURN LANE Work type: Safe <br />Name: OR99W: 64TH AVE - CANTEBURY LN (SIDEWALKS) Key: 13977 <br />Hwy/St: PACIFIC HIGHWAY WEST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99W <br />Planning: <br />Milepoints: <br />7.00 to 10.80 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 850 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />CONSTRUCT SIDEWALKS TO FILL GAPS IN NETWORK Work type: Bicycle/Pedestrian <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 71 <br />