WASHINGTON COUNTY <br />Name: I-5: OR99W TUALATIN - SHERWOOD CONNECTOR Key: 13301 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$5,991,000 2005 <br />$19,771,000 2009 OTIA III $4,942,750 OTIA III $4,942,750 EARMK $8,515,449 STATE $395,420 <br />$0 <br />$0 <br />$0 <br />$0 <br />Description: Total: $25.762.000 Applicant: WASHINGTON COUNTY Status: Env Doc sched. to begin in 2009 <br />CONNECTOR ROAD TO ALLEVIATE CONGESTION Work type: Modenuzation <br />Name: I-S:TUALATIN RIVER BRIDGE-WILSONVILLE ROAD Key: 13702 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br /> Planning: <br />Milepoints: <br />283.86 to 289.85 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$256,000 2006 <br />$50,000 2008 IM $46,110 <br />$0 <br />$13,757,000 2008 IM $12,686,705 <br />$0 <br />Description: Total: $14,063.000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />OVERLAY ROADWAY Work type: Pavement Preservation <br />Name: OR6: WILSON RIVER HWY @ MP 33.25 SLIDE REPAIR Key: 15181 <br />Hwy/St: WILSON RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-6 <br /> Planning: <br />Milepoints: <br />33.30 to 33.70 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 385 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />SLIDE REPAIR Work type: Emergency Relief <br />Name: EAST BASELINE STREET: 10TH AVE TO 19TH AVE Key: 15592 <br />Hwy/St: TUALATIN VALLEY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-8 <br /> Planning: <br />Milepoints: <br />16.13 to 16.70 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MP O Other: <br />$0 <br />$501,000 2009 CMAQ $449,547 <br />$323,000 2010 CMAQ $289,828 <br />$0 <br />$2,778,000 2011 CMAQ $2,492,699 <br />$0 <br />Description: Total: 3 602 000 Applicant: CITY OF CORNELIUS Status: Const. scheduled to begin in 2011 <br />PEDESTRIAN AMENITIES, BIKE LANES, ON STREET PARKING Work type: Bicycle/Pedestrian <br />Name: OR8: DAIRY CREEK BRIDGE #00744B Key: 14792 <br />Hwy/St: TUALATIN VALLEY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-8 <br /> Planning: <br />Milepoints: <br />14.21 to 14.41 Design: <br />ACT./AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1,922.000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />JOINT REPAIR; AC OVERLAY; RAIL RETROFIT & SEISMIC RETROFIT Work type: B <br />2008-2011 FINAL STIP ~'~'~'•oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 70 <br />