New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLUMBIA COUNTY <br />Name: US30 @ HAVLIK DRIVE <br />Key: 13976 <br />Hwy/St: LOWER COLUMBIA RIVER <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />19.60 to 20.50 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$292,000 2007 <br />$60,000 2007 <br />$0 <br />$700,000 2008 OTIA III $700,000 <br />$0 <br />Description: Total: $1,052,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />SIGNALIZE INTERSECTION Work type: Modernization <br />Name: US30: CLATSKANIE RIVER-BUNDLE 459 <br />Key: 15530 <br />Hwy/St: MT HOOD <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />60.83 to 61.76 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$129,000 2007 <br />$0 <br />$0 <br />$1,530,000 2010 OTIA III $474,300 HSIP $98,768 STP $1,372,869 <br />$0 <br />Description: Total: 1 659 000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />REPAIR AND WIDEN BR #07519 Work type: Pavement Preservation <br />Footnote: Project has Bridge & Safety element <br />Name: BEAVER CREEK (OLD HWY 30) BRIDGES #00138,#00140 Key: 14553 <br />Hwy/St: OLD HWY 30 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />8.00 to 8.00 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $2.018.000 Applicant: COLUMBIA COUNTY Status: Const. scheduled to begin in 2008 <br />REPLACE STRUCTURES Woik type: Bridee <br />Name: PARK RD: BEAVER CREEK BRIDGE <br />Hwy/St: PARK RD Key: 14978 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.06 to 0.07 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $726,000 Applicant: COLUMBIA COUNTY Status: Const. scheduled to begin in 2011 <br />REPLACE EXISTING BRIDGE #19686 Work type: Brid e <br />Name: WEST LANE ROAD - SCAPPOOSE <br />Hwy/St: LOWER COLUMBIA RIVER Key: 14011 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />OTIA III ~ $2,000,000 <br />Description: Total: $2,000.000 Applicant: COLUMBIA COUNTY Status: Const. scheduled to begin in 2008 <br />IMPROVE ROAD BETWEEN US30 AND SCAPPOOSE AIRPT OTIA 3 (FREIGHT/IND Work type: Modernization <br />ACCESS/JOB CREATION) <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.