COLUMBIA COUNTY <br />Name: OR202: NEHALEM RIVER (BANZER) BRIDGE #03140A Key: 14797 <br />Hwy/St: NEHALEM <br />• OR 202 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />43.60 to 43.80 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />REPLACE BRIDGE #03140A <br />$0 <br />$551,000 2008 HBRR $494,412 <br />$261,000 2008 HBRR $234,195 <br />$0 <br />$3,859,000 2008 HBRR $3,462,681 <br />$0 <br />$4.671,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2008 <br />Work type: Bridee <br />Name: US30: LEWIS & CLARK (LONGVIEW) BR #02046 PAINTING Key: 14180 <br />Hwy/St: MT HOOD <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />48.92 to 49.96 Design: <br />AC.I./AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $10.742,000 Applicant: ODOT Status: Advanced from FY 2009 <br />PAINT LEWIS & CLARK (LONGVIEW) BRIDGE 02046 JOINT PROJ WITH WSDOT Work type: Bridee <br />COST IS ODOT SHARE Footnote: THIS PROJECT ADVANCED TO 2006 FOR CONSTRUCTION <br />Name: US30: B STREET BIKE/PED PATH <br />Key: 11196 <br />Hwy/St: LOWER COLUMBIA RIVER <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />46.62 to 47.34 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$355,000 2001 <br />$118,000 2003 <br />$0 <br />$561,000 2008 BIKPED $50,490 ENHANC $458,081 <br />$0 <br />Description: Total: $1.034.000 Applicant: CITY OF RAINIER Status: Const. scheduled to begin in 2008 <br />CONSTRUCT AND WIDEN SIDEWALKS, ADD LANDSCAPING AND PED. Work type: Enhancement <br />AMENITIES. Footnote: Project has Bikped element <br />Name: BEAVER FALLS ROAD GUARDRAIL REPLACEMENT <br />Key: 11193 <br />Hwy/St: BEAVER FALLS ROAD <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />6.07 to 8.50 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />--- __ <br />$0 <br />$155,000 2007 <br />$0 <br />$0 <br />$1,130,000 2008 ENHANC $557,672 ENHANC $456,277 <br />$0 <br />Description: Total: $1,285,000 Applicant: COLUMBIA COUNTY <br />RESTORE/REPLACE HISTORIC ROCK GUARDRAIL. <br />Status: Const. scheduled to begin in 2008 <br />Work type: Enhancement <br />Name: US30: (LOWER) COLUMBIA RIVER HWY @ VAN STREET <br />Key: 12834 <br />Hwy/St: LOWER COLUMBIA RIVER <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />60.94 to 61.20 Design: <br />AC.I./AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />IVII'O: <br />Non-MPO Other: <br />$0 <br />$416,000 2008 STP $373,277 <br />$70,000 2009 STP $62,811 <br />$0 <br />$5,426,000 2010 STP $4,868,750 <br />$0 <br />Description: Total: $5.912.000 Applicant: ODOT <br />CONSTRUCT LEFT TURN LANE; WIDEN ROADWAY; PAVEMENT <br />PRESERVATION <br />Status: Const. scheduled to begin in 2010 <br />Work type: Modernization <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 46 <br />~~ _ 1 <br />C_ ,, <br />~ ____, <br />_~ <br />