New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINAL 2008-2011 STATEWIDE TRNSPORTATION IMPROVEMENT PROGRAM <br />Acronym or Word Definition <br />OHP Oregon Highway Plan, a plan that guides how the state highways are <br /> developed and managed over the next 20 years, an element of the <br /> OTP <br />ORS Ore on Revised Statute <br />OTIA Oregon Transportation Investment Act; special funding legislation <br /> assed b state le islature <br />OTC Ore on Trans ortation Commission <br />OTMS Oregon Transportation Management Systems; collection of bridge, <br /> congestion, intermodal, pavement, public transit, safety, and traffic <br /> mana ement s stems used to identif and rioritize ro'ects <br />OTP Oregon Transportation Plan, ODOT's comprehensive planning docu- <br /> ment <br />__ <br />PE Prelimina en ineerin <br />PL Plannin <br />PMS Pavement Mana ement S stem <br />PTD ODOT's Public Transit Division, responsible for administering the <br /> ublic transit ro am <br />Regionally Significant A transportation project that is on a facility which serves regional <br />Project transportation needs, including all principal arterial highways and all <br /> fixed idewa transit facilities. <br />RHRS Rockfall Hazard Rating System; used to prioritize landslide and rock- <br /> fall ro'ects <br />ROW Ri ht-of-wa <br />RTP Regional Transportation Plan; the official intermodal transportation <br /> plan developed and adopted through the metropolitan transportation <br /> Tannin rocess for the metro olitan Tannin area. <br />RVACT Ro e Valle ACT <br />RW Ri ht-of-wa <br />SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A <br /> Legacy for Users was signed into law on August 20, 2005, and pro- <br /> vides guaranteed funding for highways, highway safety, and public <br /> transportation for the years 2005 through 2009. SAFETEA-LU <br /> builds on the foundation of ISTEA and TEA-21, supplying the funds <br /> and refining the programmatic framework for investments needed to <br /> maintain and ow our vital trans ortation infrastructure. <br />SCOACT South Central Ore on ACT <br />SEACT South East ACT <br />SIP State Implementation Plan; for complying with the federal Clean Air <br /> Act <br />SMS Safe Mana ement S stem <br />SOV Sin le occu anc vehicle <br />SPC Statewide Pavement Committee; a management level committee re- <br /> sponsible for providing guidelines for and oversight of the statewide <br /> avement reservation rogram. <br />Page 417 <br />
The URL can be used to link to this page
Your browser does not support the video tag.