New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLACKAMAS COUNTY <br />Name: MILWAUKIE PEDESTRIAN IMPROVEMENTS:MAIN/HARRIS/21ST Key: 14439 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints. <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 502 000 Applicant: CITY OF MILWAUKIE Status: Const. scheduled to begin in 2008 <br />IMPROVE STREETSCAPE FACILITIES IN DOWNTOWN MILWAUKIE Work type: Bicycle/Pedestrian <br />Name: NORTH FORK MOLALLA RVR(DICKEY PRAIRIE RD)BR #06554 Key: 13018 <br />Hwy/St: DICKEY PRAIRIE RD. <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />3.52 to 3.55 Design: <br />ACI./AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />REPLACE STRUCTURE <br />$0 <br />$233,000 2006 <br />$23,000 2008 HBRRL $20,638 <br />$0 <br />$1,357,000 2008 HBRRL $1,217,636 <br />$0 <br />$1.613.000 Applicant: CLACKAMAS COUNTY <br />Status: Const. scheduled to begin to ZUU2S <br />Work type: Bridee <br />Name: SALMON RIVER (ELK PARK ROAD) BRIDGE Key: 14269 <br />Hwy/St: ELK PARK ROAD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$196,000 2008 HBRR $175,871 <br />$117,000 2008 HBRR $104,984 <br />$0 <br />$1,377,000 2009 HBRR $1,235,582 <br />$0 <br />Description: Total: $1,690,000 Applicant: CLACKAMAS COUNTY <br />REPLACE STRUCTURE #06574. <br />Status: Const. scheduled to begin m ZUUY <br />Work type: Brid e <br />Name: SALMON RIVER (ARRAN WANNA BLVD.) BRIDGE Key: 12001 <br />Hwy/St: ARRAN WANNA BLVD. <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.84 to 0.92 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />REPLACE STRUCTURE #06572 <br />$0 <br />$311,000 2004 <br />$60,000 2008 HBRRL $53,838 <br />$0 <br />$1,356,000 2008 HBRRL $1,216,739 <br />$0 <br />$1,727,000 Applicant: CLACKAMAS COUNTY <br />Status: Const. scheduled to begin m ZUU2i <br />Work type: Bridee <br />Name: SUNNYSIDE RD (PHASE 3) 152ND TO 172ND WIDENING Key: 12451 <br />Hwy/St: SUNNYSIDE ROAD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints. <br />0.00 to 0.01 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$2,200,000 2002 <br />$5,500,000 2006 <br />$0 <br />$13,660,000 2008 OTIAIII $3,278,400 OTIB $3,688,200 OTHER $6,693,400 <br />$0 <br />Description: Total: $21,360,000 Applicant: CLACKAMAS COUNTY Status: Advanced from FY 2008 <br />WIDEN SUNNYSIDE ROAD TO 5 LANES WITH SIDEWALKS AND BIKE LANES. Work type: Modernization <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.