New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLACKAMAS COUNTY <br />Name: US26: SE LUZAN LN - MP 30 <br />Hwy/St: MT HOOD KeY~ 15048 <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />22.49 to 30.00 Design: <br />ACT/AREA: Land Purchase: <br />METROS Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$550,000 2008 NHS $454,034 HSIP $40,577 <br />$193,000 2009 NHS $173,179 <br />$0 <br />$5,675,000 2010 NHS $4,786,647 HSIP $314,009 <br />$0 <br />Description: Total: $6,418,000 Applicant: ODOT <br />OVERLAY <br />Footnote: Project has Safety element <br />Status: Const. scheduled to begin in 2010 <br />Work type: Pavement Preservation <br />Name: US26: WILDWOOD - WEMME <br />Key: 12840 <br />Hwy/St: MT HOOD <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />38.68 to 40.01 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />2006 <br />2007 <br />2008 ~ HSIP ~ $3,516,349 <br />Description: Total: $6,401,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />CONSTRUCT CONTINUOUS LEFT TURN LANE Work type: Safe <br />Name: US26: MP 49.20 - MP 51 <br />Key: 15052 <br />Hwy/St: MT HOOD <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />49.20 to 51.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,509,000 2009 HSIP $1,391,600 <br />$118,000 2010 HSIP $108,820 <br />$0 <br />$10,917,000 2011 HSIP $10,067,657 <br />$0 <br />Description: Total: $12,544,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />INSTALL DOWNHILL PASSING LANE Work type: Safe <br />Name: US 26: FS ROAD 35 TO FS ROAD 36 <br />Key: 15065 <br />Hwy/St: MT HOOD <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />47.70 to 48.90 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$222,000 2009 HSIP $204,728 <br />$118,000 2010 HSIP $108,820 <br />$0 <br />$1,811,000 2011 HSIP $1,670,104 <br />$0 <br />Description: Total: 2151000 Applicant: ODOT <br />INSTALL SLOW MOVING VEHICLE TURNOUT & CHAIN-UP AREA <br />Status: Const. scheduled to begin in 2011 <br />Work type: Safe <br />Name: TROLLEY TRAIL: SE JEFFERSON - SE GLEN ECHO AVE Key: 13471 <br />Hwy/St: <br />• VAR Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $4.611.000 Applicant: CLACKAMAS CO. PARKS Status: Const. scheduled to begin in 2009 <br />CONSTRUCT PHASE 1 OF A BIKE AND PEDESTRIAN FACILITY ALONG AN Work type: Bicycle/Pedestrian <br />ABANDONED TROLLEY LINE Footnote: CONST CMAQ ALLOCATION IS $2,447,000 (FED) <br />2008-2011 FINAL STIP WWWOregon.gov/ODOT/HWY/ST1P/ to download and/or search Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.