New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINAL 2008-2011 STATEWIDE TRANSPORTATION IlVIPROVEMENT PROGRAM <br />Ke # Pro'ect Name Descri tion Year Conformi Status <br />15005 US 199 Unit 2 Reserve Modernization, 2010 REGIONALLY <br /> Bucket improvements SIGNIFICANT - R/W or <br /> (associated with #14019) construct medians, Construction funds cannot <br /> Note: R/W and Construction phase funds signal be included in the STIP <br /> for US 199 Expressway Upgrade: east of <br />Allen Creek Rd. <br />until COnfOrmlty StatUS 1S <br /> determined. <br />15007 Grants Pass South `Y' En- Environmental as- 2008 EXEMPT (Table 2) <br /> vironmental Assessment sessment Plannin activi <br />NOTE: No projects in the 2008-2011 STIP are located within the CO maintenance area of Grants Pass <br />(Central Business District). The projects shown in the above table are located in the PMIO, boundary, <br />but not within the CO maintenance area. <br />Three of the six projects listed in the table above for Grants Pass are exempt from regional <br />analysis. However, projects listed under key numbers 14401 and 15005 are construction funding <br />buckets associated with phases 1 and 2 respectively of the US 199 Expressway Upgrade project <br />(#14019). FHWA authorization of R/W or Construction is dependent upon completion of a re- <br />gional and USDOT conformity determination for the US 199 Expressway Upgrade project. <br />Klamath Falls <br />The Klamath Falls urban growth boundary is classified as a maintenance area for CO and PMio. <br />The STIP projects for Klamath Falls are shown in the table below: <br />KLAMATH FALLS CO AND PMIO MAINTENANCE AREA (UGB) <br />2008-2011 STIP PROJECTS <br />Ke # Pro'ect Name Descri tion Year Conformi Status <br />12555 OR 39/140 Western - Signalization, con- 2008 EXEMPT (Table 3) <br /> Lost River Diversion tinuous left turn Intersection improvement <br /> lane, sidewalks, RR - signalization <br /> grade crossing Note: a portion of the project lies <br />within the UGB. <br />14277 Intermodal Pedestrian Construct walk- 2008 EXEMPT (Table 2) <br /> Connections ways to connect Pedestrian facilities <br /> bus & historic rail <br /> stations, landscap- <br /> in , li hts, fencin <br />14552 OR 140: Lakeshore Drive Pavement preserva- 2008 EXEMPT (Table 2) <br /> -Green Springs Hwy. tion Pavement preservation <br /> Note: a portion of the project lies <br /> within the UGB: Hwy 270 MP 65.88- <br /> 66.58 and MP 68.14-68.76 (overlay <br /> work onl in this area . <br />Page 397 <br />
The URL can be used to link to this page
Your browser does not support the video tag.