New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINAL 2008-2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM <br />ENTERPRISE, November 2, 2006 <br />3 attendees <br />General Comments: <br />• Russ McMartin, Wallowa County Public Works -- I'd like to thank ODOT for all the work <br />they do for us, the OTIA projects, the ConnectOREGON and they are great to work with. <br />• Roger Averbeck, citizen - I see a need for consideration of some passing lanes between Jo- <br />seph and Enterprise. These are the two largest communities in our county [Wallowa]. <br />There's a lot of people that drive back and forth between these two communities, and I think <br />there's been some close calls out there with people trying to pass in times when they <br />shouldn't. I do note in the Draft STIP, there's a passing lane in the works for between <br />Lostine and Enterprise, but Lostine is a small community so that would pretty much benefit <br />traffic that's going in and out of the county or just to Wallowa. I'm aware that in the Wal- <br />lowa County Transportation Plan there's a reference to a passing lane study in 1996 that de- <br />scribes potential passing lanes between Joseph and Enterprise and it lists some milepoints <br />and estimated costs. I don't know if that project has fallen by the wayside or if anyone can <br />speak to that. Thank you for your time. <br />Discussions• <br />• Mike Buchanan, ODOT District 13 Manager -One piece of the OR 82 Passing Lanes Study <br />referred to is being implemented in a draft STIP project. <br />Telephone Comments Received: <br />• Roger Averbeck -contacted District 13 Manager, Mike Buchanan, wanting more informa- <br />tion on the passing lane project and the rational for selection of the area chosen. Traffic vol- <br />umes and information from the Hwy. 82 Corridor Plan will be forwarded. <br />Page 385 <br />
The URL can be used to link to this page
Your browser does not support the video tag.