FINAL 2008-2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM <br />Region 3: Total Public Attendees: 203 <br />People Attending <br />Location (excluding A(:'1'/UllU~l~ ho <br />Roseburg (1) ......................................................... 42 <br />Medford (1) ........................................................... 113 <br />Medford (2) ........................................................... 22 <br />Roseburg (2) .......................................................... 22 <br />North Bend ............................................................ 4 <br />Public Access Channel two times ...................... <br />Five meetings were held for STIP public review in Region 3. <br />ROSEBURG (1), June 7, 2006 <br />42 attendees <br />General Comments: <br />sts) <br />• Comments regarding the new interchange at Winchester were very positive. Interest in the <br />signal work at Rolling Hills Road and the problems with. the Diamond Lake Blvd/Stephens <br />Street intersection were shown. Numerous comments were made in support of the improve- <br />ments at exit 127 on I-5. Some mentioned the need for a barrier between opposing lanes on <br />I-5 north of Roseburg. <br />Discussions• <br />• Most discussion was around how the new interchange at exit 129 would work. There was <br />also a lot of discussion surrounding the improvements identified at the Diamond <br />Lake/Stephens intersection in Roseburg and support of a study to further refine future phases <br />of improvement. <br />E-Mail Comments Received: <br />• One email was received thanking us for the informative presentation. <br />MEDFORD (1), June 16, 2006 <br />113 attendees <br />Letters Received: <br />• One letter was received asking about the existing South Medford Interchange and suggesting <br />that we should keep it in operation after the new one is constructed. <br />Page 374 <br />