|
CLACKAMAS COUNTY
<br />Name: OR213: E PORTLAND FWY - CONWAY DR Key: 14765
<br />Hwy/St: CASCADE SOUTH
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: OR-213
<br /> Planning:
<br />Milepoints:
<br />0.00 to 4.00 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />METROS
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />Description: Total: $4,300,000 Applicant: ODOT Status: Const. scheduled to begin in 2008
<br />PAVEMENT RESTORATION INCLUDES SIGNING, SIGNAL LOOPS & Work type: Pavement Preservation
<br />ILLUMINATION
<br />Name: OR213: MP 7.7 - 10.75 Key: 13709
<br />Hwy/St: CASCADE SOUTH
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: OR-213
<br /> Planning:
<br />Milepoints:
<br />7.70 to 10.75 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />Description: Total:
<br />OVERLAY
<br />$0
<br />$198,000 2006
<br />$0
<br />$0
<br />$1,275,000 2008 STP $1,029,652 HEP $114,750
<br />$0
<br />$1,473,000 Applicant: ODOT
<br />Status: Const. scheduled to begin in "20025
<br />Work type: Pavement Preservation
<br />Footnote: Project has Safety element
<br />Name: OR213:CASCADE HWY SOUTH @ S MULINO ROAD Key: 13723
<br />Hwy/St: CASCADE SOUTH
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: OR-213
<br /> Planning:
<br />Milepoints:
<br />10.81 to 11.30 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0 ---
<br />$441,000 2006
<br />$552,000 2008 HSIP $509,054
<br />$10,000 2008 HSIP $9,222
<br />$1,166,000 2009 TSP $1,166,000
<br />$0
<br />Description: Total: $2,169.000 Applicant: ODOT
<br />RIGHT AND LEFT TURN CHANNELIZATION
<br />Status: Const. scheduled to begin in "2U0y
<br />Work type: Safe
<br />Name: OR213:MOLALLA AVE - BARNARDS RD Key: 13724
<br />Hwy/St: CASCADE SOUTH
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: OR-213
<br /> Planning:
<br />Milepoints:
<br />14.70 to 15.50 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$530,000 2006
<br />$620,000 2007
<br />$130,000 2008 TSP $126,100 HSIP $3,597
<br />$2,242,000 2008 TSP $2,174,740 HSIP $62,027
<br />$0
<br />Description: Total: $3,522,000 Applicant: ODOT
<br />RIGHT AND LEFT TURN CHANNELIZATION
<br />status: c;onst. scneautea to negm m ~vva
<br />Work type: Safe
<br />Name: OR 213 @ TOLIVER ROAD (MOLALLA) Key: 13157
<br />Hwy/St: CASCADE SOUTH
<br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route: OR-213
<br /> Planning:
<br />Milepoints:
<br />0.00 to 0.01 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br /> Constmction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$60,000 2008 HSIP $55,332
<br />$130,000 2008 HSIP $119,886
<br />$0
<br />$630,000 2008 OTHER $189,000 HSIP $406,690
<br />$0
<br />Description: Total: 820 000 Applicant: CITY OF MOLALLA
<br />ADD PED AND BIKE FACILITIES, ADD LEFT TURN U LANES ON OR213
<br />Status: Const. scheduled to begin in Z0v2S
<br />Work type: Safe
<br />2008-2011 FINAL STIP ~'~v~'•oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 32
<br />_)
<br />~)
<br />~.~
<br />,,
<br />i
<br />_.
<br />~._~
<br />I,. -,,~
<br />l -`,,
<br />i
<br />
|