CLACKAMAS COUNTY <br />Name: OR99E:MP 14 - MP 14.90 (OREGON CITY) Key: 13728 <br />Hwy/St: PACIFIC EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br /> Planning: <br />Milepoints. <br />14.00 to 14.90 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$359,000 2008 HSIP $331,070 <br />$0 <br />$0 <br />$1,015,000 2009 HSIP $823,709 STP $109,291 <br />$0 <br />Description: Total: $1,374,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />RESTRIPE FOR LEFT TURNS Work type: Safe <br />Footnote: Project has Preservation element <br />Name: OR212 PLAN & SUNRISE PARKWAY REFINEMENT (DAMASCUS) Key: 15375 <br />Hwy/St: CLACKAMAS BORING <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-212 <br /> Planning: <br />Milepoints: <br />1.30 to 5.50 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $1,115,000 Applicant: CITY OF DAMASCUS Status: Study 2008 <br />OR212 LAND USE & TRANSPORTATION SUB-AREA PLAN & PHASE 1 OF Work type: Planning <br />SUNRISE PARKWAY REFINEMENT PLAN <br />Name: OR213: MILK CREEK BRIDGE #02120 Key: 14794 <br />Hwy/St: CASCADE SOUTH <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-213 <br /> Planning: <br />Milepoints: <br />10.71 to 10.91 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$560,000 2008 HBRR $502,488 <br />$209,000 2008 HBRR $187,536 <br />$0 <br />$4,063,000 2009 HBRR $3,645,730 <br />$0 <br />Description: Total: $4,832,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />REPLACE BRIDGE #02120 Work type: Brid e <br />Name: OR213: MT SCOTT CREEK & UPRR BRIDGE #02135A Key: 14795 <br />Hwy/St: CASCADE HWY NORTH <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-213 <br /> Planning: <br />Milepoints: <br />9.57 to 9.77 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 616 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />REHAB WITH RAIL RETROFIT; STRENGTHEN RCDGS Woik type: Bridge <br />Name: OR213: CASCADE HWY SOUTH @ MP 2.1 SLIDE REPAIR Key: 15179 <br />Hwy/St: CASCADE SOUTH <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-213 <br /> Planning: <br />Milepoints: <br />2.00 tp 2,20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROS <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$610,000 <br />Description: Total: 726 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />SLIDE REPAIR Work type: Emergency Relief <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 31 <br />