MARION COUNTY <br />Name: OR99BUSINESS: VERDA LANE-CHERRY AVE <br />Hwy/St: SALEM Key: 13659 <br />Route: OR-99E Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Milepoints: Planning: <br />1.45 to 2.70 Design: <br />ACT/AREA: Land Purchase: <br />MWACT Utility Reloc: <br />Construction: <br />MPO: <br />SALEM-KEIZER MPO Other: <br />$0 <br />$105,000 2007 <br />$1,000 2008 HEP $900 <br />$0 <br />$1,132,000 2009 HEP $1,018,800 <br />$0 <br />Description: Total: $1,238,000 Applicant: ODOT <br />INTERSECTION IMPROVEMENTS INCLUDING SIGNING & SIGNAL <br />MODIFICATIONS <br />Status: Const. scheduled to begin m ZUUY <br />Work type: Safe <br />Name: OR99E @ CHECKERBOARD RD <br />Key: 14204 <br />Hwy/St: PACIFIC EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br />Planning: <br />Milepoints: <br />36.80 to 37.18 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$173,000 2006 <br />$218,000 2008 STP $195,611 <br />$0 <br />$789,000 2009 TSP $789,000 <br />$0 <br />Description: Total: $1.180.000 Applicant: ODOT <br />"T" UP INTERSECTION, CONSTRUCT TURN LANE <br />Status: Const. scheduled to begin in 2009 <br />Work type: Safe <br />Name: OR213: BUTTE CREEK (JACKS) BRIDGE #01597 <br />Key: 14803 <br />Hwy/St: CASCADE SOUTH <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-213 <br />Planning: <br />Milepoints: <br />24.10 to 24.30 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$250,000 2009 HBRR $224,325 <br />$9,000 2010 HBRR $8,076 <br />$0 <br />$3,278,000 2011 HBRR $2,941,349 <br />$0 <br />Description: Total: $3.537.000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />REPLACE BRIDGE #01597 Work type: Brid>re <br />Footnote: BRIDGE IS ON MARION/CLACKAMAS CO LINE <br />Name: OR214: FRONT STREET RAMP -PROGRESS WAY SIDEWALK Key: 14708 <br />Hwy/St: HILLSBORO-SILVERTON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-214 <br />Planning: <br />Milepoints: <br />36.90 to 38.91 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 882 000 Applicant: CITY OF WOODBURN Status: Const. scheduled to begin in 2009 <br />SIDEWALK, LANDSCAPING, PED REFUGE MEDIAN Work type: Enhancement <br />Name: OR214: SILVER CR FALLS HWY @ CASCADE HWY <br />Hwy/St: SILVER CREEK FALLS Key: 14766 <br />OR 214 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: - <br />Planning: <br />Milepoints: <br />15.40 to 15.41 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$67,000 2008 HSIP $61,787 <br />$183,000 2008 HSIP $168,763 <br />$0 <br />$1,250,000 2010 HSIP $1,152,750 <br />$0 <br />Description: Total: 1 500 000 Applicant: ODOT <br />ALIGNMENT CORRECTION TO IMPROVE SIGHT DISTANCE <br />Status: Const. scheduled to begin in 2010 <br />Work type: Safe <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 153 <br />