New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARION COUNTY <br />Name: OR22: I-5 TO JOSEPH STREET Key: 14788 <br />Hwy/St: NORTH SANTIAM <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-22 <br /> Planning: <br />Milepoints: <br />1.67 to 5.16 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />SALEM-KEIZER MPO Other: <br />Description: Total: <br />OVERLAY <br />$0 <br />$76,000 2008 NHS $68,195 <br />$0 <br />$0 <br />$1,796,000 2010 NHS $1,611,551 <br />$0 <br />$1,872,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2010 <br />Work type: Pavement Preservation <br />Name: OR99E: PUDDING RIVER RELIEF CHANNEL BR #01830 Key: 14805 <br />Hwy/St: PACIFIC EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br /> Planning: <br />Milepoints: <br />24.71 to 24.91 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$111,000 2008 HBRR $99,600 <br />$32,000 2009 HBRR $28,714 <br />$0 <br />$1,490,000 2010 HBRR $1,336,977 <br />$0 <br />Description: Total: $1.633.000 Applicant: ODOT <br />REPAIR CRACKS IN CAPS & COLUMNS; SEISMIC RETROFIT; RETROFIT RAILS <br />Status: Const. scheduled to begin m ZU 1 U <br />Work type: Bridge <br />Name: OR99E: NORTH CITY LIMITS -DST (HUBBARD) Key: 15472 <br />Hwy/St: PACIFIC EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br /> Planning: <br />Milepoints: <br />28.90 to 29.30 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$2,692 <br />$707,970 <br />Description: Total: 991 000 Applicant: CITY OF HUBBARD Status: Const. scheduled to begin in 2010 <br />SIDEWALK,LANDSCAPING,LIGHTING Work type: Enhancement <br />Name: OR99E: AURORA-SALEM PAVING & SAFETY IMPROVEMENTS Key: 13624 <br />Hwy/St: PACIFIC EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br /> Planning: <br />Milepoints: <br />24.93 to 45.89 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$630,000 2005 <br />$605,000 2008 STP $542,867 <br />$2,000 2008 STP $1,795 <br />$7,910,000 2008 HEP $498,330 STP $1,419,529 STP $5,181,279 <br />$0 <br />Description: Total: 9 147 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />PVMT O'LAY/RAISE MEDIAN JEFFERSON-JAMES;SIGNLIMPRV/YOUNG Work type: Pavement Preservation <br />ST;ILLUM HARDCASTLE,LINCOLN,AZTEC Footnote: Project has Safety element <br />Name: OR99E @ BELLE PASSI ROAD Key: 14755 <br />Hwy/St: PACIFIC EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br /> Planning: <br />Milepoints: <br />33.90 to 34.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />MWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$100,000 2008 HSIP $92,220 <br />$27,000 2008 HSIP $24,899 <br />$0 <br />$1,049,000 2010 HSIP $967,388 <br />$0 <br />Description: Total: $1,176,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />CONSTRUCT TWO WAY CENTER TURN LANE Work type: Safe <br />ZOOS-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 152 <br />\ :.. <br />~ _~,~ <br />(_.._~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.