New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANE COUNTY <br />Name: MCKENZIE HWY: MP 66.7 & 68.4 BR REPLACE <br />Key: 15242 <br />Hwy/St: MCKENZIE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-242 <br /> Planning: <br />Milepoints: <br />66.70 to 68.40 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />RESURFACE <br />$0 <br />$120,000 <br />$0 <br />$0 <br />$880,000 <br />$0 <br />$1.000.000 Applicant: ODOT/WILLAMETTE NAT'LFOREST Status: Const. scheduled to begin in 2008 <br />Work type: Special Pro rg ams <br />Name: US101: SIUSLAW R BRIDGE (FLORENCE) <br />Key: 14007 <br />Hwy/St: OREGON COAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br />Planning: <br />Milepoints: <br />190.98 to 190.99 Design: <br />ACT/AREA: L and Purchase: <br />LANECO Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />REHABILITATION OF BRIDGE <br />$0 <br />$433,000 2006 <br />$0 <br />$0 <br />$4,957,000 2008 EARMK $711,667 EARMK $3,469,375 HBRR $177,917 BIKPED $99,140 <br />$0 <br />$5.390.000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2008 <br />Work type: Bridle <br />Footnote' Project has Bikped element <br />Name: US 101: SUTTON CR-SIUSLAW R BRIDGE <br />Hwy/St: OREGON COAST KeY~ 14750 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br />Planning: <br />Milepoints: <br />184.80 to 190.84 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />OVERLAY & SIDEWALK WORK <br />$0 <br />$138,000 2008 NHS $123,827 <br />$0 <br />$0 <br />$3,619,000 2010 NHS $2,597,863 BIKPED $506,660 NHS $194,840 <br />$0 <br />$3.757.000 Applicant: ODOT <br />Status: C;onst. scheduled to begin m 1Ul l) <br />Work type: Pavement Preservation <br />Footnote' Project has Bikped element <br />Name: I-105 & US20 ILLUMINATION REPLACEMENTS Key: 14780 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br />Planning: $0 _ <br />Milepomts. Design: $64,000 2009 STP $57,427 <br />0.00 to 0.00 <br />ACT/AREA: Land Purchase: $0 <br />LANECO Utility Reloc: $0 <br />Construction: $426,000 2011 STP $382,250 <br />MPO: <br />CENTRAL LANE MP Other: $0 <br />Description: Total: 490 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />ON I-105 (EUGENE), REPAIR/REPLACE 21 MAST TOWERS. ON US20 Work type: Onerations <br />(CORVALLIS), REPLACE 14 LIGHTS. Footnote: LOCATED IN BOTH CENTRAL LANE & CORVALLIS AREA MPOS. <br />Name: REGION 2 CCTV PROJECT Key: 14783 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br />Milepoints: Planning: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br />LANECO Utility Reloc: <br />Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$64,000 2008 STP $57,427 <br />$1,000 2008 STP $897 <br />$0 <br />$735,000 2009 STP $659,516 <br />$0 <br />Description: Total: 800 000 Applicant: ODOT <br />INSTALL CLOSED CIRCUIT CAMERAS AT VARIOUS LOCATIONS IN THE <br />EUGENE AREA <br />Status: C;onst. scheduled to begin m ll1llY <br />Work type: Onerations <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.