LANE COUNTY <br />Name: OR126: HORSESHOE CREEK-MAPLETON Key: 13671 <br />Hwy/St: FLORENCE-EUGENE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-126 <br /> Plaaning: <br />Milepoints: <br />7.10 to 13.58 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />OVERLAY <br />$0 <br />$276,000 <br />$0 <br />$0 <br />$5,285,000 <br />$0 <br />5 561 000 Applicant: ODOT <br />Status: Const. scheduled to begin m ZUUy <br />Work type: Pavement Preservation <br />Footnote: Project has Safety element <br />Name: OR126: DEERHORN-GREENWOOD DRIVE Key: 14751 <br />Hwy/St: MCKENZIE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-126 <br /> Planning: <br />Mtlepomts. <br /> <br />15.90 to 22.49 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 2 811 000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />OVERLAY Work type: Pavement Preservation <br />Name: OR222: WILLAMETTE RIVER (JASPER) BRIDGE #04117A Key: 14807 <br />Hwy/St: SPRINGFIELD-CRESWELL <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-222 <br /> Planning: <br />Milepoints: <br />5.10 to 5.30 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$400,196 <br />Description: Total: 499 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />HISTORIC REHAB; RAISE EXISTING PORTALS; SCOUR PROTECTION Work type: Bridge <br />Name: OR222: SPRINGFIELD SCL-JASPER BRIDGE Key: 12581 <br />Hwy/St: SPRINGFIELD-CRESWELL <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-222 <br /> Planning: <br />Milepoints: <br />1.27 to 5.10 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$560,000 2005 <br />$80,000 2006 <br />$0 <br />$2,267,000 2008 STP $2,034,179 <br />$323,000 2008 STP $289,828 <br />Description: Total: $3,230.000 Applicant: ODOT <br />WIDEN SHOULDERS AND REMOVE OBJECTS FROM CLEAR ZONE <br />stains: t;onsr. scneaureu iv vegm m cvuo <br />Work type: Safe <br />Name: MCKENZIE HWY:WHITE BRANCH SNOW GATE-LINK CO LINE Key: 13934 <br />Hwy/St: MCKENZIE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-242 <br /> Planning: <br />Milepoints: <br />61.90 to 77.30 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $3,250,000 Applicant: WESTERN FEDERAL LANDS HWY DIV Status: Const. scheduled to begin in ZO10 <br />REFURFACE AND BRIDGE REPLACEMENT WHITE BRANCH SNOW GATE -LINK Work type: Pavement Preservation <br />CO LINE <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 123 <br />