DRAFT 2010-2013 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM <br />KEY TO PROJECT LISTING <br /> <br /> Shows the name <br /> and location of <br />each project <br /> <br />Shows estimated amount of <br />funds, the federal share (as <br />applicable), the year the <br />funds are committed, and the <br />type of funds committed to <br />the project <br />i+Ta~++` '~~~:'T'::.,L~~~~ R to=EG+ ~E~ -E~r. j ~a E .tI~: <br />:~iti~~~:n~: r~,niai~a: <br />3.75' gy v ;a ~~i~: <br />;~CS~SLC~L: <br />?>iPt~~ t7~z~: <br />"~:n-4L <br />~! ~ ~i~1~5;iJ~ ]i:an ;,S~uT 5t~tas: C:~nstsc:~ec~iw3t,.e,-ias'~G~lrf <br />a~~tu~ie~: TS~7~. F <br />~E%_~ ~,t _G.T.~'~, rye-..~ ="E i : uII;Te ~r~ ~ tl~~: ~'~= <br />Describes the work being done on the project Identifies who is Shows the <br />sponsoring the Shows the <br />project or who primary type year project <br />Identifies which MPO boundary the project falls requested the pro- of work is set to go <br />within (or Non-MPO for those outside). ject to contract <br />There are six primary sections in the ST1P, one for each of the five ODOT regions and one for Statewide programs. The five <br />regional sections are further sorted by County. <br />Projects are then sorted by Route and again by Work Type. <br />The following information appears for each project in this document: <br />• The first element listed is the Project Name with the Key number, a unique numeric identifier that stays with the project <br />for its entire life after the project name. <br />• The Highway Name is directly below the project name. <br />• Under the Highway name is the Route, a more common name for a specific section of roadway. <br />• Below the route are the beginning and ending Milepoints. These identify where the project starts and ends. <br />• Below the milepoints is the ACT (Area Commission on Transportation). <br />• Below the ACT is the MPO. This indicates, when applicable, which Metropolitan Planning Organization boundary the <br />project falls within. If the project is outside an MPO boundary, "Non-MPO" is listed. <br />• Below the MPO is a Description of the main project work taking place. <br />• Up and to the right is the Funding Information Section. First is Planning activities relating to studies, refinement plans, <br />location EIS, MPO planning, State Planning & Research projects. The next four lines are Design, Land Purchase, Utility <br />Relocation and Construction. These are the phases of a construction project. Other is for activities such as Transit <br />(planning, operations, and purchase), other non-construction projects and certain activities unique to a specific project. <br />The Total Cost and Year columns identify how much total funding is programmed for each phase and the year it was <br />started (if prior to the 2010-2013 STIP period) or the year it is planned to begin. Each column to the right of these phases <br />identifies the type of funding programmed and the amount of that fund. Required matching funds are not included in the <br />columns located to the right of the Total Cost column. <br />• Directly below the funding information is the Applicant. This identifies who the project owner is. <br />• To the right of the applicant field is the Status of the project. This indicates what is happening with the project and in <br />what year. <br />• Below the status line is the Work Type. This identifies the primary type of work associated with each project. The STIP <br />work type order is Modernization first, then Safety, Pavement Preservation, Bridge, and Operations, followed by all other <br />work types. <br />T~tai~c_t_ afar. 1_tFumd: <br />Identifies funds <br />committed from <br />the previous <br />STIP <br />~e}': j=r'~~, <br />?apt x`and: ~F~ 3ed Prand_ Sb E: Petar~r_ ~har~. <br />'' _ ~ <br />`.:) <br />Unique .~ <br />identifier <br />for each <br />project <br />~~ <br />tL~ <br /> <br />$~;~ <br />~~ <br /> <br />~!7 <br />Page 4 <br />