New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•' I <br />VARIOUS COUNTIES <br />Name: I-84:MULTNOMAH FALLS -CASCADE LOCKS Applicant: ODOT Key: 13705 _ ) <br />Hwy/St: COLUMBIA RIVER ) <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-84 <br /> Planning: <br />Milepoints: <br />31.77 to 35.64 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />,~ <br />~. ) <br />~j <br />Total: $16,615,000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation > <br />Description: <br />50 MM OPEN GRADED OVERLAY <br />Name: OR6:WILSON R (MILLS)-US26 CONN AT I-405(D/B)-B507 Applicant: ODOT Key: 15232 '. <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ;' <br />Route: OR-6 <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,801,000 2007 <br />$184,000 2010 OTIAIII $184,000 <br />$0 <br />$32,941,000 2010 OTIA III $32,941,000 <br />$0 <br />~. <br />) <br />'. ~ ~ <br />Description: Total: $34,926,000 Status: Const. scheduled to begin in 2010 Work type: Bridee .-- -~ <br />REPLACE BR 02472, 02366, 02365; REPAIR BR 01868, 01869A, 01872A, 02367 <br />_. 1 <br />Name: OR99W:I-5 NB OFF RAMP (TIGARD) Applicant: ODOT Key: 16142 ;' <br />Hwy/St: PACIFIC HWY WEST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99W <br /> Planning: <br />Milepoints: <br />7.15 to 7.50 Design: <br />AC.I./AREA: L and Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$221,000 2010 HSIP $203,806 <br />$44,000 2011 HSIP $40,577 <br />$0 <br />$1,079,000 2012 HSIP $995,054 <br />$0 <br />_, <br />_~ <br />~. <br />Description: Total: 1 344 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />ADDADDITIONAL LANE OFF I-5 ONTO NB 99W FROM 60TH AVE - BARBUR ~ ~ <br />Name: OR99W:I-5 SB OFF RAMP TO 99W (TIGARD) Applicant: ODOT Key: 16143 \ ~ <br />Hwy/St: PACIFIC HWY WEST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ---., <br />Route: OR-99W <br /> Planning: <br />Milepoints: <br />7.37 to 8.00 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />_) <br />~. , <br />~ ) <br />_. <br />__~ <br />,) <br />~__, <br />Description: Total: 907 000 Status: Const. scheduled to begin in 2012 Work type: Safe ' <br />ADD AN ADDITIONAL LANE NB FROM 68TH TO 64TH (~ - <br />Name: US26: MILITARY CR RD -WOLF CR Applicant: ODOT Key: 15046 <br />Hwy/St: SUNSET ~ ,'' <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-26 <br />Planning: <br />Milepoints: <br />26.00 to 37.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$451,000 2008 <br />$23,000 2009 <br />$0 <br />$11,206,000 2012 NHS $9,954,592 HSIP $103,342 <br />$0 <br />~~~~~:~ <br />~_ . <br />~_. ~ <br />.., <br />Description: Total: $11,680,000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation ) ~ <br />PAVING Work type 2: Safe (.. <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 53 l <br />_..,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.