WASHINGTON COUNTY <br />Name: ROSE BIGGI AVE (SW HALL BLVD TO SW CRESCENT ST) Applicant: CITY OF BEAVERTON Key: 14400 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route• -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 647 000 Status: Final Plan sched. to begin in 2010 Work type: Modernization <br />EXTEND ROSE BIGGI AVENUE <br />Name: SW GREENBURG RD: WASH SQ/TIEDEMAN Applicant: CITY OF TIGARD Key: 11436 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Ro te• -- <br />u . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 1 851 000 Status: Const. scheduled to begin in 2011 Work type: Modernization <br />WIDEN ROADWAY TO FIVE LANES. <br />Name: TUALATIN-SHERWOOD RD ITS:TETON RD TO I-5 Applicant: WASHINGTON COUNTY Key: 14414 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route• -- <br /> Planning: <br />Milepoints: <br />0.00 to 1.40 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$131,000 2009 <br />$0 <br />$0 <br />$661,000 2010 CMAQ $593,115 <br />$0 <br />Description: Total: 792 000 Status: Const. scheduled to begin in 2010 Work type: Operations <br />TRAFFIC DETECTION & CCTV SYSTEMS ON TSR & ADV SIGNAL CONTROLS & UPGRADES <br />Name: US26 (SUNSET HWY) CABLE BARRIER Applicant: ODOT Key: 16146 <br />Hwy/St: SUNSET <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route• -- <br /> Planning: <br />Milepoints: <br />66.00 to 68.00 Design: <br />AC.1./AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 725 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />INSTALL CABLE BARRIER <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 52 <br />