New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MULTNOMAH COUNTY <br />Name: OR99W: SW NEWBURY ST VIADUCT #01983 Applicant: ODOT Key: 16033 <br />Hwy/St: PACIFIC HWY WEST <br />Ro te• OR99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />u . <br />Milepoints: <br />Planning: <br />3.21 to 3,29 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$287,136 <br />$2,394,894 <br />Description: Total: 2 989 000 Status: Const. scheduled to begin in 2011 Work type: Bridee <br />DECK OVERLAY; BRIDGE #01983 <br />Name: OR99W: SW VERMONT ST VIADUCT #01984 Applicant: ODOT Key: 16032 <br />Hwy/St: PACIFIC HWY WEST <br />R te• OR99W Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />3.45 to 3.55 Design: <br />ACT./AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO• <br />PORTLAND MPO Other: <br />$367,893 <br />$3,071,458 <br />Description: Total: 3 833 000 Status: Const. scheduled to begin in 2011 Work type: Bridee <br />DECK OVERLAY; BRIDGE #01984 <br />Name: US26:SYLVAN TO I-405 (PORTLAND) Applicant: ODOT Key: 16141 <br />Hwy/St: SUNSET <br />Route• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Milepoints: Planning: <br />71.53 to 73.94 Design: <br />ACT/AREA: L and Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 _.. <br />$702,000 2010 NHS $629,905 <br />$0 <br />$0 <br />$7,296,000 2012 NHS $5,761,097 STP $785,604 <br />$0 <br />Description: Total: 7 998 000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />2" INLAY (FULL WD) Work type 2: Operations <br />Name: I-5: PACIFIC HWY SB OVER UPRR (BRIDGE #58588E) Applicant: ODOT Key: 14800 <br />Hwy/St: PACIFIC <br />R te• I-5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Milepoints: <br /> <br />Planning: <br />301.60 to 301.81 Design: <br />ACT/AREA: L and Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 6 295 000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />REHAB WITH DECK OVERLAY & JOINT REPAIR <br />Name: I-5: MARQUAM - HASSALO Applicant: ODOT Key: 15140 <br />Hwy/St: PACIFIC <br />R te• I-5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />300.92 to 301.98 Design: <br />ACT/AREA: L and Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 5 760 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation <br />INTERSTATE MAINTENANCE PROGRAM PROJECT <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.