HOOD RIVER COUNTY <br />Name: US26: E CHERRYVILLE DR -SALMON RIVER Applicant: ODOT Key: 16197 <br />Hwy/St: MT HOOD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US26 <br />Planning: <br />Milepoints: <br />32.47 to 37.20 Design: <br />ACT/AREA: Land Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 657 000 Status: Final Plan sched. to begin in 2010 Work type: Safe <br />2" GRIND AND INLAY <br />Name: I-84: EXIT 64 (HOOD RIVER) -BUNDLE 224 Applicant: ODOT Key: 15644 <br />Hwy/St: COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-84 <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$813,000 2007 <br />$0 <br />$0 <br />$12,493,000 2010 OTIAIII $1,873,950 OTIAI $9,119,890 STATE $1,499,160 <br />$0 <br />Description: Total: $13.306.000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />REPLACE #07398 AND EXIT 64 INTERCHANGE IMPROVEMENTS <br />Name: OR35:000PER SPUR RD - NEAL CREEK RD Applicant: ODOT Key: 16153 <br />Hwy/St: MT HOOD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-35 <br /> Planning: <br />Milepoints: <br />84.96 to 91.55 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$267,000 2010 STP $196,455 HSIP $44,321 <br />$0 <br />$0 <br />$2,763,000 2012 STP $2,032,977 HSIP $458,647 <br />$0 <br />Description: Total: 3 030 000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />2" GRIND & INLAY; REPLACE2" INLAY & REPLACE GUARDRAIL <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 39 <br />