New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-09 Lane County CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-09 Lane County CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:04:46 AM
Creation date
6/1/2009 12:21:21 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
Lane County CIP
Document_Date
5/1/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br />Jasper Road Extension - S. 57t" Street to Jasper Road <br />South 571h Street to Jasper Road <br />Projact #: 1994-2 <br />Category: GENERAL CONSTRUCTION <br />Scope: Phase 2 construction of a new arterial between the Eugene-Springfield Highway and the Springfield-Creswell <br />Highway. The roadway will include a rural section and an improved, at-grade, railroad crossing and <br />intersection with Jasper Road. <br />Justification: The new extension would shift through traffic away from the local street network. <br />i= Y 2005 <br />Cast: 2,500,000 <br />R?W: 125,000 <br />TC}TAL: 2,625,000 <br />Jasper-Lowell Road, MP 10.545-11.006 <br />Pioneer Street to Dexter Lake <br />Rs~ad #: 6220-00 <br />MP: 10.545 to 11.006 <br />Project #: 6220-3 FC: Urban Collector <br />Cat~:gary: COMMUNITY DEVELOPMENT ROAD IMPROVEMENT ASSISTANCE PROGRAM <br />Scope: Reconstruct existing improved section. <br />Justification: Request from City of Lowell to improve pedestrian conditions as well as pavement condition in lieu of just a <br />preservation project. <br />FY 2006 <br />Cost: 470,000 <br />R/W: 0 <br />TOTAL: 470,000 <br />Judkins Point Interchange North <br />Glenwood Boulevard at Interstate 5 <br />Project #: 0875-5 <br />Category: COMMUNITY DEVELOPMENT ROAD IMPROVEMENT ASSISTANCE PROGRAM <br />Scope: Ramp Improvements on north side of interchange. _ <br />Justification: Part of a larger set of improvements on both sides of the interchange. <br />1=Y 2005 <br />Cast: 200,000 <br />RiVlf: <br />TC}TAL: 200,000 <br />Latham Road, MP 0.00-0.965 Road #; 2699-00 <br />Highway 99 to South 6'" Stree[ iV1P: 0.00 to 0.965 <br />Project #: 2699-2 i=C: Rural Minor Collector <br />Category: PEDESTRIAN AND BICYCLE IMPROVEMENTS <br />Scope; Project may consist of the installation of bike lanes, sidewalks, striping to delineate bike lanes, or the addition <br />of paved shoulders for bike and pedestrian use. <br />Justification: A list of bike and pedestrian projects was created under the Transportation System Plan for areas outside of <br />cities serving destinations such as stores, schools and community centers in rural communities. This project <br />was identified in the Cottage Grove TSP. <br />~Y 2007 <br />Cast: 580, 000 <br />R1ti1U; <br />TOTAL: 580,000 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.