New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission ___ Budget and Program Summa <br />6. The Working Capital Reserve acts as a revolving account which is drawn down and replenished on a <br />monthly basis to fund Eugene's and Springfield's cash flow needs. <br />7. The Rate Stability Reserve is used to accumulate revenues available at year-end after the budgeted <br />Operating Reserve target is met. It is budgeted based on projected revenues and expenditures and is <br />intended to lessen the size of needed rate increases over time. <br />8. The Operating Reserve is used to account for the accumulated operating revenues net of operations <br />expenditures. The Commission has adopted a policy of maintaining a minimum Operating Reserve <br />balance approximately equal to 10% of the adopted Operating Budget. This targeted level of funding <br />provides for contingency funds in the event unanticipated expenses or revenue shortfalls occur during the <br />budget year. <br />9. The Revenue Bond Reserve was established in FY OS-O6 to recognize and record reserves required by <br />revenue bond covenants. <br />10. The Debt Service line item is the sum of interest and principal payments on the Revenue Bonds. <br />Page 12 FY OS-06 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.