WASTE ACTIVATED SLUDGE THICKENING <br />Facility Process Component <br />Secondary Treatment <br />$2,657,000 <br />Total Cost <br /> PRIOR <br />Costs EXPEND- 2005=06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Construction 2 657,000 2 657,000 <br />TOTAL 0 2,657 000 0 0 0 0 2 657 000 <br />FUNDING SOURCE <br />Capital Reserve 2,157,000 2,157,000 <br />SDC Reimbursement Reserve 200,000 200,000 <br />SDC Improvement Reserve 300 000 300,000 <br />TOTAL 0 2,657;000 0 0 0 0 2,657;000 <br />Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Third Gravity Belt Thickener <br />DESCRIPTION: Third gravity belt thickener (GBT) with associated at grade building. Assumes additional <br />basement floor space is not required. <br />JUSTIFICATION: Provides additional capacity for WAS thickening and potentially delays the construction of <br />additional digesters. <br />PROJECT DRIVER: Additional capacity to provide WAS thickening with one unit offline at WWMW upper limit <br />flow projections. Nitrification required by the NPDES permit and increasing wastewater <br />flows and loads generates more WAS solids. Provide ability to conduct recuperative <br />thickening so that need for additional digestion volume can potentially be deferred. <br />PROJECT TRIGGER: Exceeding solids and hydraulic loading rate design criteria. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $2,500,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $2,657,000 <br />(2005 Dollars): <br />PHASING: Budgeted for FY 2005106 <br />Page 66 FY OS-06 BUDGET ANA CIP <br />