New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WASTE ACTIVATED SLUDGE THICKENING <br />Facility Process Component <br />Secondary Treatment <br />$2,657,000 <br />Total Cost <br /> PRIOR <br />Costs EXPEND- 2005=06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Construction 2 657,000 2 657,000 <br />TOTAL 0 2,657 000 0 0 0 0 2 657 000 <br />FUNDING SOURCE <br />Capital Reserve 2,157,000 2,157,000 <br />SDC Reimbursement Reserve 200,000 200,000 <br />SDC Improvement Reserve 300 000 300,000 <br />TOTAL 0 2,657;000 0 0 0 0 2,657;000 <br />Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Third Gravity Belt Thickener <br />DESCRIPTION: Third gravity belt thickener (GBT) with associated at grade building. Assumes additional <br />basement floor space is not required. <br />JUSTIFICATION: Provides additional capacity for WAS thickening and potentially delays the construction of <br />additional digesters. <br />PROJECT DRIVER: Additional capacity to provide WAS thickening with one unit offline at WWMW upper limit <br />flow projections. Nitrification required by the NPDES permit and increasing wastewater <br />flows and loads generates more WAS solids. Provide ability to conduct recuperative <br />thickening so that need for additional digestion volume can potentially be deferred. <br />PROJECT TRIGGER: Exceeding solids and hydraulic loading rate design criteria. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $2,500,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $2,657,000 <br />(2005 Dollars): <br />PHASING: Budgeted for FY 2005106 <br />Page 66 FY OS-06 BUDGET ANA CIP <br />