New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DIGESTER MIXING IMPROVEMENTS <br />Facility Process Component <br />Secondary Treatment <br />$2,167,000 <br />Total Cost <br /> PRIOR <br />Costs EXPEND-. 2005-06 2006-07* 2007-08 2008-09 2009-10 TOTAL <br /> ITURES <br />Design & Engineering 150,000 50,000 200,000 <br />Construction 1,967 000 1 967 000 <br />TOTAL 150000 Z 017000 0 0 0 0 2 167 000 <br />FUNDING SOURCE <br />Capital Reserve 150 000 2 017 000 2,167,000 <br />TOTAL 150,000 2,017;000 0 0 0 0 2,167,000 <br /> "Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News tzecord ractor) and 4% tnereatter <br />PROJECT: Digester Mixing Improvements Design and Construction <br />DESCRIPTION: Replace existing gas mixing system with a pump mixing system. <br />JUSTIFICATION: This project will increase the active volume of the digesters, thus allowing for additional <br /> solids stabilization volume and potentially deferring the need to construct an additional <br /> digester. <br />PROJECT DRIVER: Need for improved digester mixing to increase active digester volume. <br />PROJECT TRIGGER: Sludge residence time (SRT) and volatile solids reduction design criteria. <br />TYPE OF PROJECT: 50% Capacity; 50% Performance <br />ESTIMATED PROJECT COST $2,000,000 <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $2,167,000 <br />(FY 2005-06 Dollars): <br />PHASING: Design budgeted for FY 2004!05 <br /> Construction budgeted for FY 2005/06 <br />Page 65 FY OS-O6 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.