Additional Needs with Current Funding <br />$300,000,000 <br />$250,000,000 <br />$200,000,000 <br />$150,000,000 <br />$100,000,000 <br />$50,000,000 <br />$0 <br />000 000 000 000 000 p00 ,~0~ 000 000 000 <br />~ ~ ~ ~ ~ti ~ti ~ti ~ti ~ti ~ti ~ti <br />6~ '1~ 0 9 O~ ^' ry" M ~ h~ 0 <br />ry00 ry00 ry00 ry00 ,y0^ ry0^ r10^ ,y0^ `LO ,yo^ 'LO^ - <br />Current analysis utilizing updated unit costs identifies that $16.~ million annually in road <br />rehabilitation is needed. This funding lc~ ~l preserves all streets in the low end range of the <br />overlay condition and prevents them fallinb into a reconstruct condition. With this funding <br />we are also able to address approximately $40 million of arterials already in a reconstruct <br />condition over a 10 year period. <br />Additional Needs at 46.5 Million Dollars <br />$2oo,aoo,ooo <br />$150,000 <br />$100,000,000 <br />$50,000,000 <br />$0 <br />O O o O O o 0 0 0 0 0 <br />0 0 0 0 0 0 0 0 0 0 0 <br />0 0 0 0 0 0 0 0 0 0 0 <br />^oe, ry66, o~°`~ a1o X60 „~61 166 666 690 `L66• 0`'1• <br />Oro 0'1~ 60~ 09, ,~0~ ,~~.~ ,~~y' ,~"~ ~a ,~0~ ^ro <br />ry0 ry0 ~O ry0 ,LO ,ti0 ry0 ry0 ry0 ,y0 ~O <br />To fully address all streets needing reconstruction an average of $27 million annually in <br />rehabilitation funding would be needed over a ten year period. <br />15 <br />