BIOSOLIDS MANAGEMENT FACILITY <br />BMF OPERATIONS SUMMARY <br /> Digested Sludge <br />received from <br />WPCF (MG) Digested Sludge <br />received YTD <br />(MG) FSL Supernatant <br />Recycled back to <br />WPCF (MG) FSL Supernatant <br />Recycled YTD <br />(MG) <br /> 2003 <br />JUL 4.8 31.4 3.4 60.8 <br />AUG 4.9 36.3 4.7 65.5 <br />SEP 4.3 40.6 5.0 70.5 <br />ocT 4.1 44.7 4.9 75.4 <br />Nov 4.5 49.2 9.5 84.9 <br />DEC 4.5 53.7 17.0 101.9 <br /> 2004 <br />JAN 4.8 4.8 12.1 12.1 <br />FEB 4.4 9.3 8.0 20.0 <br />MAR 4.1 13.4 5.7 25.7 <br />APR 3.1 16.5 9.3 35.0 <br />MAY 3.9 20.4 5.9 40.9 <br />JiTN 3.6 24.0 7.7 48.6 <br />Supernatant from the Facultative Storage Lagoons continued to flow back to the Water Pollution Control <br />Facility during the month. <br />The Biosolids Dewatering Facility produced 1039.1 dry tons during the month of June. <br />Contractors continued construction on the irrigation pump station. <br />5 <br />