15. Where sections of curb or curb and gutter are removed by the permittee, a minimum of 10 <br />linear feet of curb and gutter shall be removed and replaced. An alternative to this <br />requirement shall be removing and replacing 3 linear feet of curb and gutter with the new <br />curb and gutter tied into the existing curb by inserting three 12 inch x #4 rebar dowels into <br />drilled %2 inch diameter by 6 inch deep holes in the adjoining existing curbs and gutters, 1 <br />dowel in the curb and 2 dowels in the gutter at each end of the replaced section. <br />When the gutter bar portion of the curb and gutter is removed along an asphalt street, at least <br />24 inches of asphalt concrete shall be removed to allow sufficient room for placement of the <br />forms for the new face of gutter and proper compaction of asphalt restoration. An alternate <br />to removal of adjacent asphalt shall be to saw cut the asphalt at the face of the gutter bar, <br />using the edge of asphalt as the form for concrete replacement. <br />When the curb is removed but the gutter bar is left in place, epoxy shall be used on the back <br />of the gutter to bond the existing Portland Cement Concrete (PCC) to the new PCC being <br />placed (i.e. at driveways, handicapped access ramps, etc.). <br />16. If a street light, or traffic control facility is damaged, the permittee or contractor shall <br />immediately notify the Inspector and Traffic Operations personnel. Traffic Operations is <br />available at 682-4965 or 682-4800. All repairs shall meet current City Standard Specifica- <br />tions. All repairs shall be the permittee's responsibility and shall be performed at the <br />pernuttee's expense. Repairs shall be performed by City staff, or by an approved contractor <br />as directed by the Inspector. <br />17. Bicycle/wheelchair ramps and bypasses shall be constructed or upgraded to current ADA <br />standards whenever a curb, driveway approach, or sidewalk is constructed, improved or <br />replaced at any point in a block which gives reasonable access to a crosswalk and where no <br />ramp currently exists. (See ORS 447.310.) <br />18. The permittee shall notify the Inspector at least 1 full business day before any permanent <br />surface restoration is to be made by the permittee's own staff or that of contractor working <br />for the permittee. <br />19. The top finish elevation grade for underground vaults shall be at least 18 inches below the <br />finish grade of the surface AC or PCC. <br />20. Above ground facilities shall not be placed in a manner that would cause a vision obstruction <br />as defined by EC 6.010 (j). <br />21. When wastewater lateral markers in new developments (typically 2 inches x 4 inches wood <br />posts) are damaged, they shall be replaced by the permittee or the permittee's contractor. <br />This replacement shall require excavation to uncover the wastewater lateral and ensure the <br />Utility & R/W Permit Manual <br />Exhibit A - 30 <br />C:\WINDOWS\Temporary Internet Files\OLKB202\03rowrlexa.wpd -Manual (03ROWR 1).WPD(11/07/03) <br />