The general approach used to calculate the development charge for various systems is based on <br />.requirements set forth in ORS 223.297: <br />• Reimbursement fees "shall promote the objective that future system users contribute no <br />more than an equitable share to the cost of reserve capacity in the existing facilities." <br />• Improvement fees shall be established considering "the cost of projected capital <br />improvements needed to increase the capacity of the systems to which the fee is related." <br />• ...Credits are required for "qualified public improvements." <br />This general approach is illustrated in Figure 1 and can be outlined in the following steps: <br />(1) Determine System Service Characteristics. <br />a System consists of several components (e.g., lines, pump stations, force mains, <br />manholes are components of the wastewater system). <br />~ Establish impact measure -that feature of development that best reflects use of <br />system capacity (e.g., trips for the transportation system, impervious surface for the <br />stormwater system, etc.). <br />(2) Determine System Value, including associated costs such as design, construction, right <br />of way acquisition and project administration. <br />~ Use replacement cost (current construction costs). <br />~ Determine capacity-oriented cost of system, net of assessments and grants. <br />D Determine ratio of Improvement and Reimbursement portions of charge, if any. <br />(3) .Allocate the system value to the unit of impact (e.g., cost per unit of impervious area for <br />stormwater system). <br />(4) Determine the service impact of specific development types (e.g., SFD, manufactured <br />home parks, commercial, industrial etc.). <br />Final calculations will be rounded to the nearest dollar. <br />2.2.1 Administrative Costs <br />Administrative costs: are estimated annually and include the periodic andn-going dir°"ct <br />_ _ end indirect costs associated with complying with the requirements of state law and the <br />cost of administering the SDCs. An administrative charge shall be incurred when ohe of <br />.the following occurs: <br />(1) When a redevelopment occurs that changes the use of a building in its entiret~and <br />it is determined that usage of any capital. improvement is increased or there is need of <br />additional capital improvements. <br />The administrative fee will be calculated either as a percentage rate of the net <br />charge after credits are applied or at a flat rate; whichever is higher, as listed in <br />the SDC fee schedule on page F-7 of Appendix F. <br />(2) When a redevelopment occurs that changes the use of a building in its entirety <br />and it is determined that there will be no increased usage of any capital improvement and <br />no additional capital improvements will be needed. <br />~- The administrative fee will be applied at _a flat rate~as listed~n~the SDC fe~ <br />schedule on pate F-7 of Appendix F. <br />City of Eugene SDC Methodology Page 5 <br />