New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-22-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-22-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:49:31 AM
Creation date
6/1/2009 12:09:52 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
2/15/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.3 Change of Use <br />When a change of use of an existing development results in an increased impact on the regional <br />wastewater facilities (as demonstrated by calculating the SDC for both uses), the SDC will be charged <br />on the increased impact. This is determined by calculating what the development's charge would be <br />for the current use, and for the proposed use. If the proposed use would result in a higher charge,. the <br />difference is collected. <br />2.4 MW~ Wastewater SDC Credit <br />A credit for property taxes on real property paid to retire bonded debt incurred for the construction of <br />regional wastewater facilities shall be deducted from the MWMC wastewater SDC. The credit shall <br />accrue from the year of annexation to the City, and be based upon the assessed value of the real <br />property at the time of application for connection to the system. The current credit is shown in <br />Attachment 3. <br />2.5 MWMC Wastewater Administrative Charge <br />A further adjustment to the MWMC wastewater SDC is the addition of administrative costs. MWMC <br />will incur staff costs for the updating and processing of the charge. These costs are applied on a per <br />connection basis. The MWMC wastewater administrative charge per permit is applied to the total <br />SDC fees after all other charges and credits have been applied. <br /> Attachment 3 <br /> <br />>:;:#~t~ .. d>I ::. ates<:::.:::::: <br />:It:or~~.1:1~iWM~.:'It!Vastewa~~e:r..~.'::::~~~.......~ .:..:.....::..::::.:.:......: <br /> <br /> For Fiscal Year 2000 Credit, effective Se tember 15, 1999 <br /> Year of. Credit per $1,OQ0 <: Yeah of Cred~lr per $~ifl(~p <br /> A~nexatidrr.':.. :. Assessed Value ..:. . <br />Ann~xatton ', <br />Assessed Value ; <br /> 1979 $4.47 1989 $2.18 <br /> 1980 $4.38 1990 $1.75 <br /> 1981 $4.32 _ 1991 $1.35 <br />1- <br />~ <br />1982 <br />$4.20 <br />1992 <br />$1.17 <br /> 1983 $4.03 1993 $1.03 <br /> 1984 $3.88 1994 $0.86 <br /> 1985 $3.68 1995 $0.71 <br /> 1986 $3.38 .1996 $0.57 <br /> 1987 $3.03 1997 $0.39 <br /> 1988 $2.62 1998 $0.18 <br /> <br />City of Eugene.. SDC Methodology Wastewater age C-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.