New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-22-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-22-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:49:31 AM
Creation date
6/1/2009 12:09:52 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
2/15/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 5 <br />S <br />Re Tonal MW.MC: ;.Was#ewater 5 sterns Deuelo meet ~a "e n;~~. ~ . <br />;;9 .. ~ ~ ............:..:::...:.:.::::::::::.... Y P.... _...........:.. J....... .......Y ....... <br />----~ <br />2. MWMC System Capacity and Allocation of Capital Values <br /> Design Percent of Component Design Percent of Component: <br />«~:.»»»»:'>:.>:::::::::: Capacity Facility Cost Value Capacity facility Cost Value <br />"'"}`~`~~':1<#>~ <br />.::.J::::::.~:::.::::.;::.;~:.,.:. 49 000 000 <br />~ 22.00% $16 037,000 <br />, 0 0% $0 <br />~'~'~"<?~«<~<~~':'"~> <br />............................................. <br />............................................. <br />............................................. 175 000 000 43.00% $31 345 000 1$,000,000 100% $6,170,000 <br />............................................ <br />66 000 <br />19% <br />$13 850 000 <br />0 <br />0% <br />$0 <br /> <br /> <br /> <br /> <br /> <br /> <br />.:~::. <br />71 600 <br /> <br /> <br /> <br />, ° <br />16 /o <br /> <br /> <br /> <br />0 <br />11 663 0 <br />$ <br /> <br /> <br />0 ° <br /> <br /> <br /> <br /> <br />/o 0 <br /> <br /> <br /> <br />$ <br /> <br /> <br />'it;~~S> 0 <br /> <br />100 /o <br /> <br /> <br />000 <br />$72,89 0 <br /> <br /> <br />100 /o <br />6 170 000 <br /> <br />$ <br />. . . <br />A. Average Daily Flow: <br />Cost of Component _ Design flow =Cost per gallon of average daily flow <br />$16,037,000 = 49,000,000 gallons per day =$0.327 per gallon of average daily flow <br />B. Peak Flow* (allocates peak wet weather capacity to average user flow): <br />Cost of Peak Flow Component _ Average Design flow =Cost of peak flow capacity per gallon of average <br />~ daily flow <br />($31,45,000 + $6,170,000) = 49,000,000 gallons per day = $0.766 per gallon of average daily flow <br />C. Biochemical Oxygen Demand (BOD): <br />Cost of BOD Component _ Design BOD daily capacity =Cost per--pound of BOD per day <br />$13,850,000 _ 66,000 pounds per day = $209.85 per pound <br />D. Suspended Solids (SS): <br />Cost of SS Component + Design SS daily capacity =Cost per pound of SS per day <br />$11,663,000 = 71,600 pounds per day = $162.89 per pound <br />The unit cost of Peak Flow is calculated on the basis of average daily plant capacity of 49, 000, 000 to enable recovery of <br />costs from system users. <br />~- _., <br />~_ . <br /> <br /> <br />City of Eugene SDC Methodology <br />Wastewaterpage C-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.