FIGURE 4 <br />Local Wastewater System <br />Level of Service <br />Impact Measurement <br />D Daily flow, wastewater <br />discharge <br />System Value <br />Build-out replacement costs <br />- Assessable costs <br />= SDC eligible costs <br />Formula: <br />Cost of Service (Per unit of capacity) <br />System valuation <br />(Value of existing + Value of planned) = Unit of capacity <br />Build-out capacity (mgd) <br />City of Eugene`SDC Methodology Wastewater, Page C- 6 <br />