New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-00-13-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-00-13-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 8:57:15 AM
Creation date
6/1/2009 12:08:51 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
9/27/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To avoid noise disturbances, normal working times for work performed under a permit shall be <br />restricted to the hours between 7:00 a.m. and 7:00 p.m. unless otherwise specifically authorized by <br />permit, license, or variance. EC 4.083(g), 4.084 <br />3.F MAINTENANCE OF ROADWAY DRAINAGE <br />A permittee shall maintain all gutters, ditches, and other drainage features unobstructed and free of <br />sediment, dirt, and debris. For curb and guttered streets the gutters shall remain unobstructed for <br />the full depth of the adjacent curb and for a width of at least. one foot in width from the face of the <br />curb at the gutter line. Whenever a valley gutter crosses an intersecting street, an adequate waterway <br />shall be provided and at all times maintained. EC 7.307 (3) <br />3.G TEMPORARY PATCHING AND PERMANENT RESTORATION <br />The permittee shall not open more than 400 linear feet of trench without backfilling the trench the <br />same working day. The permittee shall be required to backfill and patch temporarily with asphalt <br />concrete material any excavation in a vehicle traffic lane, bike lane, sidewalk, or on a bike path the <br />same day of excavation and shall maintain the temporary patch until the final surface repair is placed. <br />Temporary trench repair shall be maintained sufficiently to prevent settlement or an irregular surface. <br />`''Where it is impracticable to backfill and complete temporary surface restoration the same day. of <br />trench opening, the permittee may seek prior written approval of the Inspector to leave a trench open <br />overnight. With prior written approval the permittee may leave a maximum of 4001inear feet of <br />trench open overnight, provided the permittee establishes and maintains barriers and warning devices <br />to protect open trench zones. <br />As soon as practicable, but in no case greater than 60 days after completion of the permit work and <br />at permittee's expense, permanent pavement replacement within the public way shall be completed <br />in accordance with City Standards by a qualified contractor or by the permittee if the Inspector agrees <br />the permittee has the required resources and trained personnel. If the permittee fails to make the <br />permanent pavement repair within the time specified, the City may make the repair and charge the <br />cost thereof to the permittee without prior notification. EC 7.307 (1) <br />NOTE⢠The permittee is responsible for insuring that the Inspector is notified one business <br />day in advance of the time the permanent repairs are to be made. <br />The Inspector shall maintain a file containing the location of and the permittee responsible for all <br />temporary pavement patches. An inspection 50 days after the placement of a temporary patch shall <br />be made with a notification sent to the permittee requiring replacement of the temporary patch if it <br />Utility & R/W Permit Policy <br />EX~llblt A - 31 r:\adminord\rules\OOrowrlexa.wpd(09/13/00) <br />