(10) linear feet of curb and gutter shall be removed and replaced. An alternative to this <br />requirement shall be removing and replacing three (3) linear feet of curb and gutter with the <br />new curb and gutter tied into the existing curb by inserting 6"X #4 rebar dowels into drilled <br />one-half inch diameter by three (3) inch deep holes in the adjoining existing curbs and <br />gutters, one dowel in the curb and two dowels in the gutter at each end of the replaced <br />section. <br />When the gutter bar portion of the curb and gutter is removed along an asphalt street, at least <br />24 inches of asphalt concrete shall be removed to allow sufficient room for placement of the <br />forms for the new face of gutter and proper compaction of asphalt restoration. An alternate <br />to removal of adjacent asphalt shall be to saw cut the asphalt at the face of the gutter bar, <br />using the edge of asphalt as the form for concrete replacement. When the curb is removed <br />but the gutter bar is left in place, epoxy shall be used on the back of the gutter to bond the <br />existing P.C.C. to the new P.C.C. being placed (i.e. at driveways, handicapped access ramps, <br />etc.). <br />14. Any traffic control devices (signing, striping, pavement markers, traffic signal loops, etc.) <br />damaged or removed during the work allowed by the permit shall be replaced by the <br />permittee. <br />15. Bicycle/wheelchair ramps and bypasses shall be constructed or upgraded whenever a curb, <br />driveway approach, or sidewalk is constructed, improved or replaced at any point in a block <br />which gives reasonable access to a crosswalk and where no ramp currently exists. (ORS <br />447.310) <br />16. The permittee shall notify the Inspector at least one full business day in advance of the time <br />any permanent surface restoration is to be made by the permittee's own staff or that of <br />contractors working for the permittee. <br />17. The elevation of finish grade for underground vaults shall be at least 18" below the finish <br />grade of the surface A.C. or P.C.C. <br />18. Above ground facilities shall not be placed in a manner which would cause a vision <br />obstruction as defined by Eugene Code Section 6.010 (j). <br />19. When wastewater lateral markers in new developments (typically 2"x 4" wood posts) are <br />damaged, they shall be replaced by the permittee or the permittee's contractor. This <br />replacement shall require excavation to uncover the wastewater lateral and ensure the correct <br />location for the replacement marker. <br />20. Catch. basins or storm inlets abutting the work area shall be inspected by the permittee or <br />their contractor at the conclusion of work and cleaned of construction related debris as <br />necessary. <br />Utility & R/W Permit Policy <br />EXlliblt A - 26 r:\adminord\rules\OOrowrlexa.wpd(09/13/00) <br />