Metropolitan Wastewater Management Commission Capital Improvement Program <br />CLARIFIER IMPROVEMENTS <br />•:~.,. <br />y fs ~ ,;emo„a,.x <br />.. ~.. <br />a..~t... ~~ r ~{ s <br />... ., . <br />h fi ~ i. <br />4 P lilt <br />~. <br />X ._ <br />Project Phasing F~ _ <br />Far:arnr-S~r~a,ctfH`Ic: Y'.'PC.F I <br />Description: Clarifier Improvements (originally Primary Clarifier Enhancements, Secondary Clarifier <br /> Enhancements and new 9rh and 10rh Secondary Clarifiers). Also added to this project: the <br /> Equipment Replacement projects to replace clarifier drives ($720,000) and to replace existing <br /> gates and operators in the Secondary Clarifiers ($120,000); and the Major Rehabilitation of <br /> existing Clarifier floors ($1,080,000) and- rehab of existing rake arms in the Primary Clarifiers <br /> ($240,000). An additional $540,000 was transferred to the project for construction of the . <br /> Contractor Courtyard and Tertiary Treatment Tie-In. includes landscaping in vianity. <br />Status: The MWMC clarifier construction phase is underway by MKB (general contractor). Project <br /> completion is anticipated by June/July 2008. <br />Justification:.. ,Enhancing the existing clarifiers will increase primary and secondary. treatment capacity and will <br /> maximize the facilities investment in existing infrastructure. Adding the two new clarifiers will <br /> increase secondary treatment capability and increase ability to handle peak flows. <br />Project Driver: Increase capacity to treat base and peak flows and improve effluent quality and reliability so that <br /> a blended primary and secondary effluent can meet the current National Pollutant Discharge <br /> Elimination System (NPDES) total suspended solids limits. <br />Project Trigger: From the MWMC 2004 Facilities Plan -the trigger for this project is unacceptably high clarifier <br /> surface overflow rates and wet weather flows. <br />Project Type: 100% Capacity -Primary Clarifier Enhancements <br /> 50% Capacity and 50% Performance -Secondary Clarifier Enhancements <br /> 100% Capacity - 9rh and 10`h Secondary Clarifiers <br />Estimated Project Cost: Authorized budget for this project is $17,480,000. Estimated cost to complete is $16.1 million. <br />Expected Cash Flow: FY 07-08 = $5,591,337 <br />Expenditure/Category: Prior Years 2007-08 2008-09 2009-10 2010-11 2011-12 Total <br />Design/Construction $11,888,663 $5,591,337 0 0 0 0 $17,480,000 <br />Other 0 0 0 0 0 0 0 <br />Total Cost $11,888,663 $5,591,337 $0 $0 $0 $0 $17,480,000 <br />Funding Source: <br />Capital Reserve <br />EPA Grant <br />SDC Reimbursement Reserve <br />SDC Improvement Reserve <br />Equipment Replacement <br />Reserve <br />Total Cost <br />Prior Years 2007-08 2008-09 .2009-10 2010-11 2011-12 Total . <br />$11,888,663 $3,566,337 0 0 0 0 $15,455,000 <br />0 0 0 0 0 0 0 <br />0 $1,425,000 0 0 0 0 1,425,000 <br />0 $600,000 0 0 0 0 600,000 <br />.' <br />0 0 0 0 0 0 0 <br />$11,888,663 $5,591,337 $0 $0 $0 $0 $17,480,000 <br />Page 60 FY 07-08 BUDGET AND CIP <br />