Metropolitan Wastewater Management Commission Capital Improvement Program
<br />INFLUENT PUMPING IMPROVEMENTS AND HEADWORKS EXPANSION
<br />(COMBINED INFLUENT PUMP STATION/ WILLAKENZIE PUMP STATION/ DRY
<br />WEATHER HEADWORKS)
<br />~~~rpnt..-- ~;.,~; avena~e
<br />6N{MlisS~ _.~ ^.
<br />Wih.+srY .. w Witeu..
<br />p {
<br />1, ~ ~t
<br />:5'
<br />ttUM+x~
<br />t ~.. .
<br />--Gravsry 9aai
<br />.- TTlchrnrw~ Fac uMM
<br />Prr4«tiaimsuM: ~,,~
<br />Pax ~i~a~,
<br />
<br />,^f `
<br />~ ra
<br />l
<br />t I
<br />~
<br />
<br />,,
<br />....-
<br />,,, , ,p i
<br />wa,
<br />....
<br />'stn ~
<br />a~
<br />y^
<br />+
<br />.
<br />,i ~
<br />C
<br />' ,
<br />~ ` ~'
<br />~rri6wtfl
<br />Y
<br />t ~
<br /> h~°T
<br /> \
<br /> - ~
<br />~
<br /> °~ -- `
<br />_
<br />ProjxYPhasfng ~~
<br />ft~Cjrt7N~5ptirlt~fir.?Itf yt~PCr
<br />Description: This project provides influent pumping improvements and headworks expansion required to accommodate
<br /> the 2025 peak wet weather flow of 277 mgd. The scope and budget of this project incorporates the
<br /> following three (3) projects previously described in the FY 06/07 CIP budget report: Willakenzie Pump
<br /> Station Expansion, Influent Pumping Improvements, and Dry Weather Headworks. The budget for this
<br /> project includes $360,000 from the Equipment Replacement Reserve for the replacement of Equipment
<br /> #'s 15884 through 15889 (Pressure Line Gates) and newly included in the FY 07-08 budget, it includes
<br /> $45,000 from the Equipment Replacement Reserve for replacing 2 fans for the biofilter odor control
<br /> system and $12,000 from Major Rehabilitation Reserves for the replacement of two grit channel metal
<br /> rails. The project Includes landscaping and screening around the new construction area.
<br />Status: The RFP for preliminary design was issued August, 2006, Proposals were evaluated and consultant for
<br /> preliminary design (up to 30%) was selected in November, 2006, Commission approved negotiation of
<br /> preliminary design contract with selected firm on December 14th, 2006..
<br />Justification: Improved influent pumping and headworks hydraulic capacity are required to increase total plant influent
<br /> hydraulic capacity to 277 mgd. There are also outstanding issues regarding the redundancy requirement
<br /> for pumping which may affect the ultimate solution.
<br />Project Driver: Systematic elimination of sanitary sewer overFlows by the year 2010.
<br />Project Trigger: Collection system computer model estimates the current wet weather peak flow to plant to be 264 mgd.
<br /> Overall existing peak flow capacity is 175 mgd so there is already a capacity deficit
<br />Project Type: 100% Capacity
<br />Estimated Project Cost:. $27,715,000
<br />Expected Cash F low: FY 07-08 = $1,515,000, FY 08-09 = $25,166,652
<br />Expenditure/Category: Prior Years 2007-08 2008-09 2009-10 2010-11 2011-12 Total
<br />Design/Construction $1,033,348 $26,681,652 0 0 0 0 $27,715,000
<br />Other 0 0 0 0 0 0 0
<br />Total Cost $1,033,348 $26,738,652 $0 $0 $0 $0 $27,772,000
<br />Funding Source: Prior Years 2007-08 2008-09 2009-10 2010-11 2011-12 Total
<br />Capital Reserve $1,033,348 $24,293,652 0 0 0 0 $25,327,000
<br />EPA Grant 0 0 0 0 0 0 0
<br />SDC Reimbursement Reserve 0 $1,400,000 0 0 0 0 $1,400,000
<br />SDC Improvement Reserve 0 $1,000,000 0 0 0 0 $1,000,000
<br />Equipment Replacement
<br />Reserve 0 $45,000 0 0 0 0 $45,000
<br />Total Cost $1,033,348 $26,738,652 $0 $0 $0 $0 $27,772,000