New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4003 Environmental Solutions 2009-00256
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4003 Environmental Solutions 2009-00256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:22:35 PM
Creation date
5/18/2009 1:24:15 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004003
GL_Project_Number
915046
Identification_Number
2009-00256
COE_Contract_Number
2009-00256
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• effects of proj ect on hydraulic and hydrologic characteristics ofthe wetlands, <br /> . • discussion of baseline wetland functions and values, and effects of the project, using the , <br /> H dro. eama hic HGM Assessment racess <br /> y g ~ ~ ) p <br /> • fill and removal calculations in both area and volume this is usually obtained from, the . <br /> <br /> .E engineering firm completing the pro <br /> j ect site design} <br /> • mapping to Shaw the onsite wetlands, removal and fill impact areas <br /> . • figures including speci#ic maps, cross-sections <br /> This ro osal does not cover the cost of re arin <br /> a Sediment and Erosion Control Plan assumed to be <br /> ~ ~ ~ g <br /> required for the project, and would therefore be required with the JPA. The plans will need to be . <br /> . completed by you, as I am not qualified to prepare them, Please note that the cast range far mapping has . . <br /> the,higher cost if a professional survey is not required,and Environmental Solutions LLC is able to use <br /> their GPS unit, and completed the wetland delineation boundary and sample point mapping. <br /> 3 <br /> 3 <br /> 3 J <br /> ~.0 LIMITATIQNS Td THE SCOPE <br /> The following items are not included within the scope of work for this. project:. <br /> • Sediment and Erosion Control Plan <br /> ' • Cultural Resources Assessment <br /> • DSL wetland delineation review fee of $364 ~ ~ ~ . <br /> • DSL permit application fee, anticipated to be $650. <br /> • Corps permit application fee, anticipated to be $ ~ 00-$~50~ <br /> ~ • Preparation~of other investigations, site visits, documents, reports, or presentations which maybe <br /> required,by local or~other agencies during the~~course of the project <br /> 3.0 FEE ~ ~ ~ ~ . <br /> . ~ The estimated fees for cam letion of the wetland Delineation and Joint Removal-Fill ermit a licatian <br /> p P pp <br /> are presented in detail below. Fees and expenses are according to the rates and terms outlined in my <br /> ~ Natural Resources Professional contract with the City of Eugene.. In same instances, the estimated costs <br /> .are presented as a range based on variables typically associated. with a project such as this. Billing will be <br /> for time and materials expenses far completion of .the pro <br /> j ect. ~ Should .the scope of the proj ect change <br /> ~ from. what is outlined above such that additional costs would be incurred, this proposal can be amended <br /> with written agreement from the City of Eugene and Environmental Solutions LLC. . <br /> 1. Wetland Delineation <br /> Field Investigation:10-16 hrs ecologist and assistant $1400.00-$240.00 <br /> Documentation and compilation of report:l6-24 hrs ecologist.f.......f..........H $1520:00-$2250.0 <br /> Mapping: l0-24 hrs~ cartographer $500.00-$1200.00. . <br /> Misc. coordination Eugene, DSL}: up to 4 hrs ecologist ................................................................,.$350.00 <br /> Materials and Expenses incl. mileage, copies, historic aerial photos} .:...................................up ~o $400.00 <br /> Estimated cast range of Wetland Delineation $4200.00-$6100.00. gnat to exceed}* <br /> * does not include cost of professionally surveying wetland boundaries and~plots ~ ~ <br /> 2. Joint Removal-Fill Permit Application ~ ~ ~ ' <br /> Preparation of JPA as outlined above: 32-40 hrs biologist $3040.00-$3500.00 <br /> Preparation of HGM Function Assessment: 4. hrs biologist $3 80.00 <br /> Preparation of f gores for JPA:16-24 hrs cartographer $500.00-$1200.00 <br /> Misc coordination Eugene, DSL}: up to 4 hrs biologist ..........................:.........................................$380.0 <br /> Materials and expenses :...........................................~........:..................................................................$200.00 <br /> .Estimated cost range of JPA...........u.u...u.u....u.a......n..q.....r.......a.n...$4800.00-$5960.00 (not to exceed} <br /> _ _ . _ , , _ ,t . _ <br /> The wetland delineation field work and report is anticipated to be completed in May, and the JPA in June, . ~ <br /> dependent upon when the surveyors provide me with maps and when I .am provided the necessary <br /> Environmental Solutions LLC: Praposad, for City of Eugene Public Works Engineering <br /> Wetland.Consulting Services for Phase 3 of the Delta Pans Habitat Enhancement.Praject, Eugene, Lane County, Oregon . <br /> April Zo09 ~ ~ ~ Page 2 . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.