New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PWA-000178 (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PWA-000178 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2009 10:29:45 AM
Creation date
2/24/2009 5:11:46 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
Identification_Number
PWA-000178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order Justification <br /> j <br /> CONTRACTOR: Wildlsh Construction Co. Job # 3502 <br /> P.O. Box 7428 Contract # 2004-20 <br /> Eugene, OR 97401 Change Order # i <br /> PROJECT: Garden Wav Improvements <br /> Reason for Change Order: <br /> i <br /> ~ Contract <br /> Item <br /> i No. <br /> ' 1060 -1140 ODOT a roached Cit en ineerin staff Burin construction of this ro'ect and informed us of an u comin 1.105 avin ro'ect in <br /> which their tans called for Wckin loaded haul vehiGes across Garden Wa between sta. 39+00 and 43+50. The Ci and ODOT worked out <br /> the details to address loaded Wcks on this section of Garden Wa and asked Wildish for and estimate to erfortn the work. The items in this <br /> than a order are all due to these than es. <br /> 1060 Increased the de th of drivewa to from 6" fo 8" on three drivewa between stations 39+00.43+50 <br /> 7070 Su I #4 rebar for three drivewa between station 39+00 - 43+50 -120' total, 20 foot sticks <br /> 1080 Place misc. blocks, ties and wire for relnforoln drivewa between stations 39+00 - 43+50. <br /> 1090 Three masons at 8 hours each to tie and set rebar in drivewa between station 39+00 - 43+50 <br /> 1100 Increase utter bar de th from standard 7" to 9" in de th between curb cuts each drivewa between station 39+DO - 43+50. <br /> 1110 Mason cha a -four mason hours to lace and flnlsh extra PCC <br /> 1120 Additional drivewa excavation of 7.5 cub(c rds <br /> 1130 Reduced 12" rock to 10" of rock to ain extra 2" of base course AC - F_xtra AC between station 39+00 - 43+50 <br /> <br /> ! 1140 Rock structure was ahead rou hed in and had to be raded down. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.