New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PWA-000178 (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PWA-000178 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2009 10:29:45 AM
Creation date
2/24/2009 5:11:46 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
Identification_Number
PWA-000178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # 35oz <br /> Contract # 2004-20 <br /> CONTRACTOR: WILDISH CONSTRUCTION CO. ~ Change Order # 1 <br /> (ADDRESS) P 0 BOX 7428 Date: 07/20/04 ' <br /> Eugene, OR 97401-0428 CAMS Date: <br /> Reviewed b : Date: <br /> PROJECT: Paving, curbs, gutters, sidewalks median, street lights traffic signal Inspector: John Bonham <br /> street trees, wastewater, and stone water drainage on Garden Way from Paige Dickinson <br /> S;sters View Ave. to Martin Luther King Jr. Blvd north side of Martin Luther Proj. Mgr. Steve Gallu <br /> King Jr. Blvd. from Marche Chase Drive to I-5 Principal Eng. Paul Klo e <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 1060 Increasa the de th of ddvewa to 8" on three drivewa be een stations 39+00 - 43+50 <br /> 1070 Reinforce three drivewa between station 39+00 - 43+50 with it4 rebar <br /> 1080 Install miscellaneous blocks, ties and wire for reinforcin drivewa between stations 39+00.43+50. <br /> 1090 Tie and set rebar in drivewa between staton 39+00 - 43+50 <br /> 1100 Increase utter bar de th from standard 7" l0 9" in de th between curb cuts each drivewa between station 39+00 - 43+50. <br /> 1110 Place and finish extra PCC ' <br /> 1120 7.5 cubic rds of drivewa excava8on same three ddvewa s. <br /> 1130 Extra AC between station 39+00 - 43+50 <br /> 1140 Extra radin far vaned a re ate structure <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change (Units) Cost Amount Change Change <br /> Od final 0.00 ! 0.00 0.00 $0.00 <br /> Revised 0.00 ~ 0.00 0.00 <br /> 1060 Inaease Driveways to 8" Depth 0 Amended 3.50 CY $70.00 $245.00 $245.00 <br /> Ori final 0.00 ' 0.00 0.00 $0.00 <br /> Revised 0.00 ~ 0.00 0.00 <br /> 1070 #4 Rebar - 20' Sticks 0 Amendetl 120.00 ;Each $6.00 $720.00 $720.00 <br /> Od final 0.00 ' 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> 1080 Supply misc. blocks & tie wire for Reinfo ent o Amended 1.00 ; LS $100.00 $100.00 $100.00 <br /> Od final D.00 I 0.00 0.00 $0.00 <br /> Revised 0.001 0,00 0.00 <br /> 1090 Set blocks&TieRebar 0 Amended 24.OOIHR $55.00 $1320.00 $1,320.00 <br /> Ori final 0.00 ; 0.00 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 1100 Inaease Gutter Bar Depth to 9" D Amended 1.00 ,CY $70.00 $70.00 $70.00 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 ' 0.00 0.00 <br /> 1110 Piace Extra PCC 0 Amended 4.00 HR $55.00 $220.00 $220.00 <br /> Ori final 0.00 0:00 0.00 $0.00 <br /> Revised 0.00 t 0.00 0.00 <br /> 1120 7.5 CY of dHveway excavation 0 Amended 7.50 CY $20.00 $150.00 , $150.00 <br /> Orl final 0.00 ~ 0.00 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 1130 Extra AC (additional 2") 0 Amended 168.60 $46.00 $7,755.60 $7,755.60 <br /> Ori Inal 0.00 ' 0.00 0.00 50.00 <br /> Revised 0.00 I 0.00 0.00 <br /> 1140 Extra grading for varied aggregate structure 0 Amended 1.00 ItS $1,250.00 $1,250.00 $1,250.00 <br /> Od final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 0 Amended 0.00 t $0.00 $0.00 $0.00 <br /> The original contract work days are o.0 da <br /> The contract time change this C.O o.o da <br /> The contract time change by previous C.O.'s o.D da <br /> The new contract work da s are 0:o da s <br /> The original contract sum was 82,079,a5o.75 <br /> Net change by previous change order $0.00 <br /> Net change due to amendment by previous change order ~ ~ ~ ~ ~ • <br /> So.oo <br /> The contract sum prior to this change order was <br /> This change order will change contract sum by this amount ~ ~ ~ 82,079,450.75 <br /> <br /> ' _ $11.830.60 <br /> The new contract net change sum <br /> So.oo <br /> <br /> ' The new contract amendment sum 811,83oso <br /> The new contract sum including this change orderwill be <br /> Percents a of on final contract 82,091,281.35 <br /> 0.57% <br /> NET CHANGE DUE TO AMENDMENTS _ <br /> 0.57% <br /> App val by: <br /> ~ ~ <br /> City Engineer Prime a ctor Third Party <br /> ~Lz vl ~ <br /> Date Dat <br /> Date <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASINGICRO <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.