New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4579 GeoDesign Contract #2009-00235
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4579 GeoDesign Contract #2009-00235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2009 10:18:52 AM
Creation date
2/17/2009 9:35:40 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004579
GL_Project_Number
995314
COE_Contract_Number
2009-00235
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of ~u~ene Contract 2008-D0~5 <br /> ~•1 <br /> ` exhibit ~-Pro~o~al Pavemet7t Engineering <br /> <br /> 'i ErV1CE5-2010 <br /> ~ EIN~ <br /> No~rember ~ 2oas <br /> City of Eugene <br /> Pwbli~ forks Engineering Division' <br /> East Broadway <br /> Eugene, aR ~7~01 <br /> Attention; Mr. Matt Rodrigues <br /> Proposal <br /> Pavement Er~glneering Services <br /> City of Eugene Ppl~ ~~10 <br /> Various Sites <br /> Eugene, Oregon <br /> ~eoDesign Praject;~Eugene-~ ~-Q1 <br /> INTR~DULTIDN <br /> GeoDesign,lnc, rs pleased to submit this proposal for pavement eng[rreerir~g service far the <br /> City of Eugene, ~regan {City. The scope of this proposal is to evaluate pment rehabilitation <br /> aptioa~s by completing falling weight def~ectometer ~FWD~ testing, subsurface explaratior~s, and <br /> equivalent single-axle land (U calculations. fur analysis will be carnpleted an the faNawing <br /> aty streets: <br /> + Harlow Road from Cahurg Road to I-S overpass {5,478 feet, two travel lanes with middle lane <br /> River Road from Horn Lane to Railroad Boulevard {654 i fee#, four travel lanes with middle <br /> lane} <br /> ~ Augusta Street from East 2 Avenue to East Aveenue ~3,9~8 feet, two travel lanes) . <br /> BA~~GR~UND AND APpR4ACH <br /> Based on information provided by Mr. Matt Rodrigues, we understand that the City is considering <br /> rehabilitation of the above-listed road sections, In addition, we understand that the City would <br /> like #a consider fu[I depth reclamation for streets or street sections that re~ulre full depth <br /> rr~canstruction, We have cQrnpieted a preliminary evaluation of the existing paverrrents at the <br /> site. Based on our observations, Harlow Road artd River Road are good candidates far <br /> rehabi[itatian,w~ile Augusta Street may need to lae reconstructed. <br /> 15 S7S ~ 54qu~la Pk+~+Y • ~ulh Ia0 I Pertlend, 4R 9112 I olr 503.9G8.d787 I F~ 503,9G8.3048 <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.