A Literature_Review for the project area. Contractor shall examine the following facilities and <br /> documents: the SHPO in Salem, OR; General Land Office maps; Sanborn Fire Insurance <br /> Maps; and other records archives for -known prehistoric .and historical archaeological <br /> resources and for project background information. <br /> ~ A Field Reconnaissance (scoping trip), including areconnaissance-level pedestrian survey <br /> with widely spaced transects (30 meters or greater) or a field visit. The field visit will enable <br /> the archaeologist to identify areas of high and low probability to determine the appropriate <br /> level of survey and/or sub-surface probing for the project area, if needed. <br /> , ~ <br /> ask.2' ~ <br /> Contractor shall: <br /> • Provide a BaSeline/Reconnaissance Deport to Agency within 30 calendar days from NTP. <br /> 'a~_ ti. err ti~A cement A~iex~ ~ ndari~ (~r~',Ivi" ~ r'`1inor~~'lr~n= c~rtat'~`~z <br /> sects . <br /> ODOT has a Programmatic Agreement with SHPO that. allows Agency to obtain archaeological <br /> clearances for minor transportation projects through a memorandum to file. The PA .Memos are " <br /> . compiled in ~ notebook at the end of the year and submitted to SHPO. The PA Memo includes . <br /> information from, scoping trips or reconnaissance surveys, maps, and photos. The Agency <br /> Archaeologist will keep the final PA Memo on file to be submitted to' SHPO at the end of the <br /> year. <br /> If a site is located within the API; then .the project is automatically elevated out of the <br /> Programmatic Agreement and a technical report and site forms. are required to be submitted to <br /> SHPO for review and compliance. This will follow the Phase One Archaeological Survey under <br /> Task 3.2. <br /> The PA Memo required under this task shall include results of the literature review and scoping. , <br /> trip; a description of the API; a detailed project description, methodology,. recommendations #or <br /> future work, site protection measures or avoidance areas, a summary;maps, and photos. ' <br /> As part of development of the PA Memo, Contractor shall conduct: <br /> • A Literature Review for the project area, as identified in Task 2. ' <br /> • , A Field Reconnaissance jscoping trip), as identified in Task <br /> Tas 1' lifi~~Ui~ <br /> • Contractor shall provide a PA Memo to Agency within 60 calendar days from NTP. <br /> Contractor shall establish a file system for electronic and hard copy files of all. final documents <br /> prepared . by Contractor. At the conclusion of the Project, Agency shall be supplied with an <br /> electronic copy of all documents produced and a hard copy of the project file. <br /> All final document files, including original research files, that are the responsibility of Agency to <br /> <br /> - prepare according to this Scope shall be filed and maintained by Agency. <br /> Archaeology Scope of.Work <br /> _ _ <br /> <br />